Summary for Test 2024-04-29-30-4
Test performed: AASHTO T96-02r10Project Information
| Project Identifiers | Project ID: 994588 DEA: 081H3904 EFIS: 0817000032 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-15-R20.5/R21.6,R25.5/R30.7 |
| Award Date | 07/13/2023 |
| Closeout Date | Not set |
| Work Description | CONSTRUCT BUILDING, ROADWAY EXC, JPCP, AND TEMPORARY BARRIER SYSTEM. |
| Location Description | SAN BERNARDINO COUNTY FROM 0.6 MILE NORTH OF CLEGHORN ROAD UNDERCROSSING TO 0.5 MILE SOUTH OF ROUTE 138 AND FROM 0.5 MILE SOUTH OF TRUCK SAFETY CHECK AREA TO 0.4 MILE NORTH OF OAK HILL ROAD OVERCROSSING |
| QA Service Level | 1 (Verified on 08/02/2023) |
Sample Information
| Sample Taken Date | 04/29/2024 | Sample Unique Key | 30 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/30/2024 |
| Sample type | Verification | A brief description of the sample | PSUE 3/4" HMA-A-SP R15 0.75% LAS |
| The quantity of what the sample constitutes | 4 Bags Of Bin Agg., 1 Bag Rap | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | G | Last name of sampler or witnessed by | Ramirez |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | 0206A-24 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Vulcan - Oro Grande | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-36-0022, 91-36-0046 |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
| The plant number | A detailed description of where the material sample was collected | Belt Cut at Vulcan Oro Grande Plant | |
| Where the material sample would have been placed if not sampled | Asphalt Paving | Primary Aggregate Nominal Size | 3/4 inch |
| The concrete mix design number | 224112A ORO SJR | Lot number | |
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2024-04-29-30
DIME Test ID: 2024-04-29-30-4
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T96-02r10: Standard Method of Test for Resistance to Degradation of Small-Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine (Los Angeles Rattler)
Test Release Date: 2024-06-12
Test Results
Input Type: Measured
Tester's full name: Amir Sarder
Date of test: 05/03/2024
Grading designation: B
Mass of sample (before test): 5000 grams
Mass of sample on No.12 sieve (after 100 revolutions): 4672 grams
Mass of sample on No.12 sieve (after 500 revolutions): 3465 grams
Percent loss after 100 revolutions: 7 %
Percent loss after 500 revolutions: 31 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 6/12/2024 ✔
