Project Details

This page displays current information for project DEA: 081H3904.

Project Information

Project IdentifiersProject ID: 994588
DEA: 081H3904
EFIS: 0817000032
DIST-CO-RTE-PM08-SBD-15-R20.5/R21.6,R25.5/R30.7
Award Date07/13/2023
Closeout DateNot set
Work DescriptionCONSTRUCT BUILDING, ROADWAY EXC, JPCP, AND TEMPORARY BARRIER SYSTEM.
Location DescriptionSAN BERNARDINO COUNTY FROM 0.6 MILE NORTH OF CLEGHORN ROAD UNDERCROSSING TO 0.5 MILE SOUTH OF ROUTE 138 AND FROM 0.5 MILE SOUTH OF TRUCK SAFETY CHECK AREA TO 0.4 MILE NORTH OF OAK HILL ROAD OVERCROSSING
QA Service Level1 (Verified on 08/02/2023)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
mauricio.santa-cruz@dot.ca.govMauricio Santa CruzResident EngineerCaltrans RE DB
oluwatayo.ogeyemi@dot.ca.govOluwatayo OgeyemiStructural RepresentativeCaltrans SR DB
julien.atallah@dot.ca.govJulien AtallahMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Displaying 1-10 of 22 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
2024-04-02-504/02/202404/03/2024Quality AssuranceSMTL TM7 - Epoxy Coated RebarView
2024-04-02-604/02/202404/03/2024Quality AssuranceSMTL TM7 - Epoxy Coated DowelsView
2024-04-02-704/02/202404/03/2024Quality AssuranceSMTL TM7 - Epoxy Coated DowelsView
2024-03-29-103/29/202404/03/2024Quality AssuranceSMTL TM5 - Threaded BarView
2024-03-27-4603/27/202403/27/2024AcceptanceSoilView
2024-03-18-3803/18/202403/18/2024AcceptanceSoilView
2024-03-18-3903/18/202403/18/2024AcceptanceSoilView
2024-03-05-5303/05/202403/05/2024AcceptanceSoilView
2024-03-05-5403/05/202403/05/2024AcceptanceSoilView
2024-02-28-4502/28/202402/27/2024AcceptanceSoilView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods