Sample Record

Owner Lab

  • CT D06 - Millbrook Field Laboratory

DIME Sample ID 2023-12-09-3

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 994109
DEA: 060W1704
EFIS: 0617000103
DIST-CO-RTE-PM06-FRE-41-R27.4/R28.5
Award Date11/10/2022
Closeout DateNot set
Work DescriptionREMOVE AC PAVEMENT, WIDEN TRAVEL WAY, AND CONSTRUCT RETAINING WALL.
Location DescriptionFRESNO COUNTY IN FRESNO FROM 0.1 MILE SOUTH OF ASHLAN AVENUE OVERCROSSING TO SHAW AVENUE OVERCROSSING
QA Service Level1 (Verified on 07/13/2022)

Sample Information

Sample Taken Date12/09/2023 Sample Unique Key3
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing12/10/2023
Sample typeAcceptance A brief description of the sample4x8 concrete cylinders
The quantity of what the sample constitutes6 cylinders From where was the sample collectedJob Site
First name of sampler or witnessed byD Last name of sampler or witnessed byBorsch
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameCal Valley Construction Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeConcrete The concrete mix design numberND22023
The truck number from where the sample was collected The batch plant ticket number from where the sample was collected111334529
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedwall 3 Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2023-12-09-3-1CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersTomas Silva, CT D06 - Millbrook Field Laboratory01/05/2024Tomas Silva
Yes
01/05/2024

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2023-12-09-3-1 CTM 521-June 2020 (Verified)