Project Details

This page displays current information for project DEA: 060W1704.

Project Information

Project IdentifiersProject ID: 994109
DEA: 060W1704
EFIS: 0617000103
DIST-CO-RTE-PM06-FRE-41-R27.4/R28.5
Award Date11/10/2022
Closeout DateNot set
Work DescriptionREMOVE AC PAVEMENT, WIDEN TRAVEL WAY, AND CONSTRUCT RETAINING WALL.
Location DescriptionFRESNO COUNTY IN FRESNO FROM 0.1 MILE SOUTH OF ASHLAN AVENUE OVERCROSSING TO SHAW AVENUE OVERCROSSING
QA Service Level1 (Verified on 07/13/2022)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
mark.mengoni@dot.ca.govMark MengoniResident EngineerCaltrans RE DB
benjamin.holton@anseradvisory.comBenjamin HoltonStructural RepresentativeCaltrans SR DB
justin.palmaymesa@dot.ca.govJustin PalmaymesaMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Displaying 1-10 of 107 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2024-09-16-209/16/202409/16/2024AcceptanceSoilView
2024-08-28-708/28/202408/28/2024Quality AssuranceRoadway/Bridge SurfaceView
2024-08-26-2908/26/202408/28/2024Quality AssuranceHot Mix AsphaltView
2024-08-26-2808/26/202408/28/2024Quality AssuranceAggregateView
2024-08-13-608/13/202408/13/2024Quality AssuranceAggregateView
2024-08-08-5108/08/202408/08/2024Quality AssuranceAggregateView
2024-08-13-108/13/202408/13/2024AcceptanceConcreteView
2024-08-08-2508/08/202408/08/2024Quality AssuranceSoilView
2024-08-08-2408/08/202408/08/2024Quality AssuranceAggregateView
2024-08-07-1908/07/202408/07/2024Quality AssuranceSoilView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Displaying 1-10 of 24 results.
Declaration NumberMaterial TypeVendorSubmitted byQuantity
EPD-191Carbon Steel RebarCMC Steel ArizonaCMC Rebar (TAMMY ARAGON)20513 lb
EPD-191Carbon Steel RebarCMC Steel ArizonaCMC Rebar (TAMMY ARAGON)24586 lbs
EPD-191Carbon Steel RebarCMC Steel ArizonaCMC Rebar (TAMMY ARAGON)5387 lbs
EPD-191Carbon Steel RebarCMC Steel ArizonaCMC Rebar (Maria Sanchez)30,196 LBS
EPD-191Carbon Steel RebarCMC Steel ArizonaCMC Rebar (Maria Sanchez)1,376 LBS
EPD-191Carbon Steel RebarCMC Steel ArizonaCMC Rebar (Maria Sanchez)267 LBS
EPD-191Carbon Steel RebarCMC Steel ArizonaCMC Rebar (TAMMY ARAGON)13600 lbs
EPD-191Carbon Steel RebarCMC Steel ArizonaCMC Rebar (TAMMY ARAGON)184 lbs
EPD-191Carbon Steel RebarCMC Steel ArizonaCMC Rebar (TAMMY ARAGON)184 lbs
EPD-191Carbon Steel RebarCMC Steel ArizonaCMC Rebar (TAMMY ARAGON)13600 lbs

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods