Sample Record

Owner Lab

  • G3 Quality, Incorporated - Cerritos

DIME Sample ID 2023-10-27-44

Project Information

Project IdentifiersProject ID: 212112
DEA: 080C2514
EFIS: 0816000076
COOP: 081645
DIST-CO-RTE-PM08-SBD-10-0.0/13.2
Award Date06/06/2018
Closeout DateNot set
Work DescriptionDesign-Build of I-10 Corridor Contract 1 - Adding 2 new Express Lanes
Location DescriptionLA/SBD County Line to PM 13.2 near I-15
QA Service Level1 (Verified on 10/16/2019)

Sample Information

Sample Taken Date10/27/2023 Sample Unique Key44
Will the laboratory/organization for which you are a member perform testing on this material sample?No Date that the sample was received by the laboratory/organization performing the testing11/08/2023
Sample typePer Request A brief description of the sample#9 HRC 500/510
The quantity of what the sample constitutes25 From where was the sample collectedJob Site
First name of sampler or witnessed byRobert Last name of sampler or witnessed byMendoza
Title of samplerInspector Telephone number of sampler(951) 264-7798
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameCMC Rebar Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure nameVineyard Deck Stage 2

Material Information

Material TypeSMTL TM5 - Couplers Production or Authorization TestingProduction Testing
Service or UltimateUltimate Material Standard CodeASTM A706
Material Grade60 Rebar ManufacturerCMC Rebar
Coupler ManufacturerHRC Intermediate Assembler or Fabricator
Rebar Size#9 Coupler ModelHRC 500/510
Coating StandardsUncoated Shape of RebarStraight
Rebar Hoop Diameter Rebar Hoop Fabricator
Coupler Component Heat/Lot Number(s)79001741 and 73130586 Rebar Heat Number(s)4132251
Rebar Size 2 Coupler Unique IDTP-17-03

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2023-10-27-44-1CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)rmacias, CT HQ - Sacramento Structural Materials Testing Laboratory11/08/2023rmacias
Yes
11/09/2023Ok necking
2023-10-27-44-2CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)rmacias, CT HQ - Sacramento Structural Materials Testing Laboratory11/08/2023rmacias
Yes
11/09/2023Ok necking
2023-10-27-44-3CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)rmacias, CT HQ - Sacramento Structural Materials Testing Laboratory11/08/2023rmacias
Yes
11/09/2023Ok necking

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2023-10-27-44-1 CTM 670-December 2013 (Verified)
DIME Test ID: 2023-10-27-44-2 CTM 670-December 2013 (Verified)
DIME Test ID: 2023-10-27-44-3 CTM 670-December 2013 (Verified)