Project Details

This page displays current information for project DEA: 080C2514.

Project Information

Project IdentifiersProject ID: 212112
DEA: 080C2514
EFIS: 0816000076
COOP: 081645
DIST-CO-RTE-PM08-SBD-10-0.0/13.2
Award Date06/06/2018
Closeout DateNot set
Work DescriptionDesign-Build of I-10 Corridor Contract 1 - Adding 2 new Express Lanes
Location DescriptionLA/SBD County Line to PM 13.2 near I-15
QA Service Level1 (Verified on 10/16/2019)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
jcorona@syrusaengineering.comJose CoronaResident EngineerCaltrans RE DB
scott.bauer@dot.ca.govScott BauerMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Displaying 1-10 of 1067 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
2024-03-07-2303/07/202403/08/2024Quality ControlPolyesterView
2024-03-01-1703/01/202403/04/2024Quality ControlPolyesterView
2024-01-11-201/11/2024Quality ControlSMTL TM5 - Welded HoopsView
2024-01-11-101/11/202401/16/2024Quality AssuranceSMTL TM5 - Welded HoopsView
2023-12-21-612/21/202312/22/2023Quality AssuranceConcreteView
2023-12-01-2412/01/202312/07/2023AcceptanceHot Mix AsphaltView
2023-11-30-211/30/202301/03/2024Quality AssuranceSMTL TM3 - Fastener AssemblyView
2023-11-30-111/30/202301/03/2024Quality AssuranceSMTL TM3 - Fastener AssemblyView
2023-11-29-2211/29/202312/06/2023Production Start-UpHot Mix AsphaltView
2023-11-29-1911/29/202312/06/2023VerificationAggregateView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods