Sample Record

Owner Lab

  • CT D07 - Materials Field Laboratory, Unit 1953

DIME Sample ID 2023-09-29-40

Project Information

Project IdentifiersProject ID: 993807
DEA: 07353304
EFIS: 0718000272
DIST-CO-RTE-PM07-LA-110-23.1
Award Date11/03/2022
Closeout DateNot set
Work DescriptionREPLACE BRIDGE RAILING WITH CONCRETE BARRIER. AND UPGRADE LIGHTING.
Location DescriptionLOS ANGELES COUNTY IN LOS ANGELES AT THIRD STREET OVERCROSSING
QA Service Level1 (Verified on 05/11/2022)

Sample Information

Sample Taken Date09/29/2023 Sample Unique Key40
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing09/29/2023
Sample typeAcceptance A brief description of the sampleRelative Compaction of Polymer Concrete
The quantity of what the sample constitutesUnverifiable From where was the sample collectedJob Site
First name of sampler or witnessed byPhilip Last name of sampler or witnessed byMaquiran
Title of samplerMREA Telephone number of sampler(213) 358-1518
Laboratory sample identification23-1508 Linked DIME Sample ID
The fabricator/manufacturer/facility namePowell Construcion Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypePolyester Mfg. Lot Number(s)Unverifiable
Batch number1 Mix numberUnverifiable

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2023-09-29-40-1CTM 552-December 2013: Method of Test for Relative Compaction of Polymer Concrete Utilizing Nuclear GagesPhillip Maquiran, CT D07 - Materials Field Laboratory, Unit 195309/29/2023Phillip Maquiran
Yes
10/11/2023

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2023-09-29-40-1 CTM 552-December 2013 (Verified)