Project Details
This page displays current information for project DEA: 07353304.
Project Information
Project Identifiers | Project ID: 993807 DEA: 07353304 EFIS: 0718000272 |
---|---|
DIST-CO-RTE-PM | 07-LA-110-23.1 |
Award Date | 11/03/2022 |
Closeout Date | 09/24/2024 |
Work Description | REPLACE BRIDGE RAILING WITH CONCRETE BARRIER. AND UPGRADE LIGHTING. |
Location Description | LOS ANGELES COUNTY IN LOS ANGELES AT THIRD STREET OVERCROSSING |
QA Service Level | 1 (Verified on 05/11/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Edgar.Herrera@dot.ca.gov | Edgar Herrera | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 39 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-08-28-90 | 08/28/2023 | 08/29/2023 | Quality Control | Concrete | View |
2023-08-16-115 | 08/16/2023 | 08/17/2023 | Quality Control | Concrete | View |
2023-08-10-80 | 08/10/2023 | 08/11/2023 | Quality Control | Concrete | View |
2023-07-28-72 | 07/28/2023 | 07/29/2023 | Quality Control | Concrete | View |
2023-07-14-67 | 07/14/2023 | 07/15/2023 | Quality Control | Concrete | View |
2023-07-11-102 | 07/11/2023 | 07/12/2023 | Quality Control | Concrete | View |
2023-07-14-62 | 07/14/2023 | 07/14/2023 | Quality Control | Aggregate | View |
2023-07-11-94 | 07/11/2023 | 07/11/2023 | Quality Control | Aggregate | View |
2023-05-23-96 | 05/23/2023 | 05/24/2023 | Quality Control | Concrete | View |
2023-05-19-112 | 05/19/2023 | 05/20/2023 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods