Sample Record
Owner Lab
- CT HQ - Sacramento Cement Testing Laboratory
DIME Sample ID 2023-09-25-40
Sample is locked from editing. info
Project Information
Project Identifiers | Project ID: 8801 DEA: AML-CEM EFIS: AML-CEM |
---|---|
DIST-CO-RTE-PM | 59--- |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Special project for Cementitious Materials for use in Concrete Authorized Material List (AML) |
Location Description | Not set |
QA Service Level | NOT VERIFIED |
Sample Information
Sample Taken Date | 09/25/2023 | Sample Unique Key | 40 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/25/2023 |
Sample type | Annual Source Testing | A brief description of the sample | Type III Portland Cement |
The quantity of what the sample constitutes | 1 Bucket | From where was the sample collected | Source |
First name of sampler or witnessed by | na | Last name of sampler or witnessed by | na |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | CM235377 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Cushenbury Type III Cement | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Cementitious | Brand | Mitsubishi |
---|---|---|---|
Mill | Cushenbury | Type of Cementitious Material | Type III Cement |
Submitted Tests
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2023-09-25-40-1 ASTM C185-15a (Verified)
DIME Test ID: 2023-09-25-40-2 ASTM C191-13 (Verified)
DIME Test ID: 2023-09-25-40-3 ASTM C187-16 (Verified)
DIME Test ID: 2023-09-25-40-4 ASTM C109-21 (Verified)
DIME Test ID: 2023-09-25-40-5 ASTM C109-21 (Verified)