Sample Record

Owner Lab

  • CT D08 - Barstow Field Laboratory 1

DIME Sample ID 2023-04-24-14

Project Information

Project IdentifiersProject ID: 212112
DEA: 080C2514
EFIS: 0816000076
COOP: 081645
DIST-CO-RTE-PM08-SBD-10-0.0/13.2
Award Date06/06/2018
Closeout DateNot set
Work DescriptionDesign-Build of I-10 Corridor Contract 1 - Adding 2 new Express Lanes
Location DescriptionLA/SBD County Line to PM 13.2 near I-15
QA Service Level1 (Verified on 10/16/2019)

Sample Information

Sample Taken Date04/24/2023 Sample Unique Key14
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing04/24/2023
Sample typeQuality Assurance A brief description of the sampleSOIL
The quantity of what the sample constitutes17990SQF From where was the sample collectedJob Site
First name of sampler or witnessed byRIGOBERTO Last name of sampler or witnessed byARROYO
Title of samplerCaltrans Consultant Telephone number of sampler
Laboratory sample identification04242023TEST 01 Linked DIME Sample ID
The fabricator/manufacturer/facility nameCTM 231 TEST LOCATION Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sample
The fabricator/manufacturer designation for the sample A detailed description of where the material sample was collectedAT THE JOBSITE
Where the material sample would have been placed if not sampled

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2023-04-24-14-1CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear GagesRIGOBERTO ARROYO, CT D08 - Barstow Field Laboratory 104/24/2023Minh Pham
Yes
04/28/2023
2023-04-24-14-2CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and AggregatesRIGOBERTO ARROYO, CT D08 - Barstow Field Laboratory 104/24/2023Minh Pham
Yes
04/28/2023

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2023-04-24-14-1 CTM 231-March 2013 (Verified)
DIME Test ID: 2023-04-24-14-2 CTM 216-June 2011 (Verified)