Sample Record
Owner Lab
- CT HQ - Sacramento Aggregate Testing Laboratory
DIME Sample ID 2023-04-11-46
Project Information
Project Identifiers | Project ID: 212246 DEA: 053307A4 EFIS: 0514000027 |
---|---|
DIST-CO-RTE-PM | 05-SLO-46-49.7/54.6 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Cholame Segment |
Location Description | Not set |
QA Service Level | 1 (Verified on 09/30/2019) |
Sample Information
Sample Taken Date | 04/11/2023 | Sample Unique Key | 46 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/19/2023 |
Sample type | Per Request | A brief description of the sample | 1 bag soil |
The quantity of what the sample constitutes | 1 bag | From where was the sample collected | Source |
First name of sampler or witnessed by | Valid | Last name of sampler or witnessed by | KhataOKhotan |
Title of sampler | TEC | Telephone number of sampler | 510-292-5175 |
Laboratory sample identification | 23-SOIL-0073 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Field | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
---|---|---|---|
The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | Abut 2 Left 3-8 ft range | |
Where the material sample would have been placed if not sampled |
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2023-04-11-46-1 CTM 217-June 2011 (Verified)