Project Details
This page displays current information for project DEA: 053307A4.
Project Information
Project Identifiers | Project ID: 212246 DEA: 053307A4 EFIS: 0514000027 |
---|---|
DIST-CO-RTE-PM | 05-SLO-46-49.7/54.6 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Cholame Segment |
Location Description | Not set |
QA Service Level | 1 (Verified on 09/30/2019) |
Samples
Samples submitted for this project.
Displaying 1-10 of 1092 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-02-22-59 | 02/22/2023 | 02/23/2023 | Quality Assurance | Concrete | View |
2023-02-17-4 | 02/17/2023 | 02/17/2023 | Quality Assurance | Soil | View |
2023-02-17-3 | 02/17/2023 | 02/17/2023 | Quality Assurance | Soil | View |
2023-02-15-10 | 02/15/2023 | 02/15/2023 | Quality Assurance | Soil | View |
2023-02-15-9 | 02/15/2023 | 02/15/2023 | Quality Assurance | Soil | View |
2023-02-14-13 | 02/14/2023 | 02/14/2023 | Quality Assurance | Soil | View |
2023-02-09-4 | 02/09/2023 | 02/09/2023 | Quality Assurance | Soil | View |
2023-02-09-3 | 02/09/2023 | 02/09/2023 | Quality Assurance | Soil | View |
2023-02-09-2 | 02/09/2023 | 02/09/2023 | Quality Assurance | Soil | View |
2023-02-08-6 | 02/08/2023 | 02/08/2023 | Quality Assurance | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs submitted for this project.
Declaration Number | Program Operator | Material Type | Vendor | Submitted by |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods