Sample Record
Owner Lab
- CT D08 - Barstow Field Laboratory 1
DIME Sample ID 2023-02-08-42
Project Information
Project Identifiers | Project ID: 212112 DEA: 080C2514 EFIS: 0816000076 COOP: 081645 |
---|---|
DIST-CO-RTE-PM | 08-SBD-10-0.0/13.2 |
Award Date | 06/06/2018 |
Closeout Date | Not set |
Work Description | Design-Build of I-10 Corridor Contract 1 - Adding 2 new Express Lanes |
Location Description | LA/SBD County Line to PM 13.2 near I-15 |
QA Service Level | 1 (Verified on 10/16/2019) |
Sample Information
Sample Taken Date | 02/08/2023 | Sample Unique Key | 42 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 02/09/2023 |
Sample type | Quality Assurance | A brief description of the sample | cast concrete beams |
The quantity of what the sample constitutes | 2 | From where was the sample collected | Job Site |
First name of sampler or witnessed by | julian | Last name of sampler or witnessed by | Carmora |
Title of sampler | C3 | Telephone number of sampler | |
Laboratory sample identification | set 5 A B | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | LANEsecurity paving | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | g3-20-pcc-229he |
---|---|---|---|
The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | TIME 0945 PM | |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | AT THE JOBSITE | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Submitted Tests
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2023-02-08-42-1 ASTM C293-10 (Verified)
DIME Test ID: 2023-02-08-42-2 ASTM C293-10 (Verified)