Sample Record
Owner Lab
- CT D08 - Fontana Field Testing Laboratory
DIME Sample ID 2022-11-01-61
Sample is locked from editing. info
Project Information
Project Identifiers | Project ID: 213707 DEA: 081C38U4 EFIS: 0817000196 |
---|---|
DIST-CO-RTE-PM | 08-RIV-10-6.7/R25.1 |
Award Date | 11/26/2019 |
Closeout Date | 11/01/2023 |
Work Description | Remove concrete pavement and base, and place HMA and JPCP |
Location Description | ROUTE 10/60 SEPARATION IN BEAUMONT TO ROUTE 10/111 SEPARATION NEAR CABAZON. |
QA Service Level | 1 (Verified on 01/09/2020) |
Sample Information
Sample Taken Date | 11/01/2022 | Sample Unique Key | 61 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 11/07/2022 |
Sample type | Quality Assurance | A brief description of the sample | RHMA-G 3/4" 53418180 |
The quantity of what the sample constitutes | 2 boxes, 2 Cores | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Plant | Last name of sampler or witnessed by | QC |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | 3A22,3B22 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Martin Marietta (CCA) Lake Elsinore | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Hot Mix Asphalt | HMA Type | RHMA-G |
---|---|---|---|
HMA Grading | 3/4 inch | Lot number | |
Sublot number | HMA Mix Number |
Submitted Tests
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2022-11-01-61-1 AASHTO T209-12 (Verified)
DIME Test ID: 2022-11-01-61-2 AASHTO T275-07r12 (Verified)