Project Details

This page displays current information for project DEA: 081C38U4.

Project Information

Project IdentifiersProject ID: 213707
DEA: 081C38U4
EFIS: 0817000196
DIST-CO-RTE-PM08-RIV-10-6.7/R25.1
Award Date11/26/2019
Closeout Date11/01/2023
Work DescriptionRemove concrete pavement and base, and place HMA and JPCP
Location DescriptionROUTE 10/60 SEPARATION IN BEAUMONT TO ROUTE 10/111 SEPARATION NEAR CABAZON.
QA Service Level1 (Verified on 01/09/2020)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
elvira.lenart@dot.ca.govElvira LenartResident EngineerCaltrans RE DB
julien.atallah@dot.ca.govJulien AtallahMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Displaying 1-10 of 1400 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
2023-05-10-7005/10/202305/14/2023Quality ControlAggregateView
2023-03-08-6103/08/202303/15/2023Quality AssuranceHot Mix AsphaltView
2023-03-08-5803/08/202303/09/2023AcceptanceAsphalt BinderView
2023-03-08-3603/08/202303/08/2023AcceptanceAggregateView
2023-03-08-1803/08/202303/09/2023AcceptanceHot Mix AsphaltView
2023-03-07-1803/07/202303/07/2023AcceptanceAsphalt BinderView
2023-03-07-1703/07/202303/07/2023Quality AssuranceHot Mix AsphaltView
2023-03-07-1403/07/202303/07/2023AcceptanceAggregateView
2023-03-07-403/07/202303/07/2023AcceptanceHot Mix AsphaltView
2023-03-01-1803/01/202303/03/2023Quality ControlPolyesterView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods