Sample Record

Owner Lab

  • CT D08 - Fontana Southern Regional Laboratory

DIME Sample ID 2015-06-12-6

Project Information

Project IdentifiersProject ID: 7613
DEA: 071218W4
EFIS: 0700021119
DIST-CO-RTE-PM07-LA-5-29.4/31.6
Award Date11/29/2012
Closeout Date07/31/2023
Work DescriptionREALIGN ROUTE 5 AND RAILROAD TRACKS AND RECONFIGURE ON- AND OFF-RAMPS.
Location DescriptionLOS ANGELES COUNTY IN BURBANK FROM WEST MAGNOLIA BOULEVARD OVERCROSSING TO 0.3 MILE NORTH OF BUENA VISTA STREET/WINONA AVENUE UNDERCROSSING
QA Service Level1 (Verified on 10/08/2012)

Sample Information

Sample Taken Date06/12/2015 Sample Unique Key6
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing06/19/2015
Sample typeQuality Control A brief description of the sample6X12
The quantity of what the sample constitutes2 From where was the sample collectedJob Site
First name of sampler or witnessed byGON Last name of sampler or witnessed byCHOI
Title of samplerASR Telephone number of samplerUnknown
Laboratory sample identification889-32 Linked DIME Sample IDUnknown
The fabricator/manufacturer/facility nameJOB Transportation Laboratory (TL) Number88932
Inspector Lot Number from the Transportation Laboratory (TL) FormUnknown Structure unique identifierCIDH PILES AT CCC BR
Structure nameCIDH FOOTING

Material Information

Material TypeConcrete The concrete mix design number1570340
The truck number from where the sample was collected7078 The batch plant ticket number from where the sample was collected2069
Concrete batch plantUnknown The fabricator/manufacturer designation for the sampleUnknown
A detailed description of where the material sample was collectedTRUCK Where the material sample would have been placed if not sampledUnknown
From Lot No.Not set Bag Lot No.Not set

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2015-06-12-6-1CTM 521-November 2014: Method of Test for Compressive Strength of Molded Concrete CylindersMatthew Clayton, CT D08 - Fontana Southern Regional Laboratory07/10/2015Matthew Clayton
Yes
07/10/2015

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2015-06-12-6-1 CTM 521-November 2014 (Verified)