Project Details

This page displays current information for project DEA: 071218W4.

Project Information

Project IdentifiersProject ID: 7613
DEA: 071218W4
EFIS: 0700021119
DIST-CO-RTE-PM07-LA-5-29.4/31.6
Award Date11/29/2012
Closeout Date07/31/2023
Work DescriptionREALIGN ROUTE 5 AND RAILROAD TRACKS AND RECONFIGURE ON- AND OFF-RAMPS.
Location DescriptionLOS ANGELES COUNTY IN BURBANK FROM WEST MAGNOLIA BOULEVARD OVERCROSSING TO 0.3 MILE NORTH OF BUENA VISTA STREET/WINONA AVENUE UNDERCROSSING
QA Service Level1 (Verified on 10/08/2012)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
gchoi@prescienceusa.comGon ChoiStructural RepresentativeCaltrans SR DB
raymond.aludino@dot.ca.govRaymond AludinoMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Displaying 1-10 of 317 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
2022-12-13-1612/13/202212/13/2022AcceptanceAggregateView
2022-12-13-1712/13/202212/13/2022AcceptanceAggregateView
2022-12-13-1812/13/202212/13/2022AcceptanceAggregateView
2022-06-28-6706/28/202206/29/2022AcceptanceAggregateView
2022-06-23-8506/23/202206/27/2022AcceptanceAggregateView
2022-06-01-3006/01/202206/02/2022AcceptanceConcreteView
2022-06-01-3106/01/202206/02/2022AcceptanceConcreteView
2022-05-11-4905/11/202205/12/2022AcceptanceConcreteView
2022-02-25-2602/25/202203/02/2022Quality AssuranceAggregateView
2022-02-25-2702/25/202203/02/2022Quality AssuranceAggregateView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods