Sample Record

Owner Lab

  • CT HQ - QASI Sacramento Field Office

DIME Sample ID 2021-10-19-8

Project Information

Project Identifiers
DEA: No Project
DIST-CO-RTE-PM---
Award DateNot set
Closeout Date11/01/2022
Work DescriptionSpecial project identifier for material not associated with a project
Location DescriptionNot set
QA Service LevelNOT VERIFIED

Sample Information

Sample Taken Date10/19/2021 Sample Unique Key8
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing10/19/2021
Sample typeQuality Control A brief description of the sampleINFILTRATION TEST/RETAINING WALLS
The quantity of what the sample constitutes2 concrete cylinders for 19 day testt From where was the sample collectedFabricator
First name of sampler or witnessed bytest Last name of sampler or witnessed bytest
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility namefab Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeConcrete The concrete mix design numberfab
The truck number from where the sample was collected The batch plant ticket number from where the sample was collectedfab
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedfab Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
No results found.

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments