Project Details

This page displays current information for project DEA: No Project.

Project Information

Project Identifiers
DEA: No Project
DIST-CO-RTE-PM---
Award DateNot set
Closeout DateNot set
Work DescriptionSpecial project identifier for material not associated with a project
Location DescriptionNot set
QA Service LevelNOT VERIFIED

Samples

Samples submitted for this project.
Displaying 1-10 of 563 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
2016-02-11-302/11/201602/11/2016VerificationConcreteView
2017-11-01-3911/01/201711/01/2017VerificationAsphalt Rubber BinderView
2018-02-13-302/13/201802/13/2018VerificationConcreteView
2018-02-13-402/13/201802/13/2018VerificationConcreteView
2018-02-16-102/16/201802/23/2018Quality AssuranceSMTL TM3 - Fastener AssemblyView
2018-02-16-202/16/201802/23/2018Quality AssuranceSMTL TM3 - Fastener AssemblyView
2018-02-16-302/16/201802/23/2018Quality AssuranceSMTL TM3 - Fastener AssemblyView
2018-02-16-402/16/201802/23/2018Quality AssuranceSMTL TM3 - Fastener AssemblyView
2018-01-23-1501/23/201801/25/2018RetestSMTL TM4 - Prestressing StrandView
2018-01-31-1801/31/201802/12/2018Quality AssuranceSMTL TM4 - Prestressing StrandView

Job Mix Formula (JMF)

JMFs associated with this project.
Displaying 1-3 of 3 results.
JMF IDStatusSubmitted byDIME Sample IDDate CreatedLink
JMF3511-208-2019-122Submittal Authorized For UseClintonEdmistonCT HQ - Hot Mix Asphalt Laboratory11/17/2019View
JMF3511-208-2019-121Submittal In Progress CT HQ - Hot Mix Asphalt Laboratory11/17/2019View
JMF3511-208-2019-120Submittal Completeness in ReviewClintonEdmistonCT HQ - Hot Mix Asphalt Laboratory11/16/2019View

Environmental Product Declaration (EPD)

EPDs submitted for this project.
Declaration NumberProgram OperatorMaterial TypeVendorSubmitted byLink
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods