Sample Record
Owner Lab
- Sierra Pacific Materials
DIME Sample ID 2019-08-16-8
Project Information
Project Identifiers | DEA: No Project |
---|---|
DIST-CO-RTE-PM | --- |
Award Date | Not set |
Closeout Date | 11/01/2022 |
Work Description | Special project identifier for material not associated with a project |
Location Description | Not set |
QA Service Level | NOT VERIFIED |
Sample Information
Sample Taken Date | 08/16/2019 | Sample Unique Key | 8 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 08/16/2019 |
Sample type | Quality Control | A brief description of the sample | 1/2 HMA A |
The quantity of what the sample constitutes | JMF Verification | From where was the sample collected | Source |
First name of sampler or witnessed by | Carlos | Last name of sampler or witnessed by | Manzo |
Title of sampler | QC Technician | Telephone number of sampler | |
Laboratory sample identification | TEM12SPLA | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | SPM-Templeton | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
---|---|---|---|
HMA Grading | 1/2 inch | Lot number | |
Sublot number | HMA Mix Number | Not set |
Submitted Tests
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2019-08-16-8-1 AASHTO T324-14 (Verified)
DIME Test ID: 2019-08-16-8-2 AASHTO T283-14 (Verified)