Sample Record
DIME Sample ID 2023-09-29-40
Project Information
| Project Identifiers | Project ID: 993807 DEA: 07353304 EFIS: 0718000272 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-110-23.1 |
| Award Date | 11/03/2022 |
| Closeout Date | 09/24/2024 |
| Work Description | REPLACE BRIDGE RAILING WITH CONCRETE BARRIER. AND UPGRADE LIGHTING. |
| Location Description | LOS ANGELES COUNTY IN LOS ANGELES AT THIRD STREET OVERCROSSING |
| QA Service Level | 1 (Verified on 05/11/2022) |
Owner Lab
- CT D07 - Materials Field Laboratory, Unit 1953
Sample Information
| Sample Taken Date | 09/29/2023 | Sample Unique Key | 40 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 09/29/2023 | Sample type | Department Acceptance |
| A brief description of the sample | Relative Compaction of Polymer Concrete | The quantity of what the sample constitutes | Unverifiable |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Philip |
| Last name of sampler or witnessed by | Maquiran | Title of sampler | MREA |
| Telephone number of sampler | (213) 358-1518 | Laboratory sample identification | 23-1508 |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Powell Construcion | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Polyester | Mfg. Lot Number(s) | Unverifiable |
|---|---|---|---|
| Batch Number | 1 | Mix number | Unverifiable |
Submitted Tests
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2023-09-29-40-1 CTM 552-December 2013 (Verified)
