Sample Record
DIME Sample ID 2023-06-25-1
Project Information
| Project Identifiers | Project ID: 214988 DEA: 050L7214 EFIS: 0515000097 |
|---|---|
| DIST-CO-RTE-PM | 05-SLO-1-32.6 |
| Award Date | 03/08/2021 |
| Closeout Date | 09/16/2025 |
| Work Description | REMOVE & CONSTRUCT CONCRETE BRIDGE, CONCRETE SLAB, BRIDGE RAIL & HMA. |
| Location Description | SAN LUIS OBISPO COUNTY IN MORRO BAY AT TORO CREEK BRIDGE |
| QA Service Level | 1 (Verified on 09/03/2020) |
Owner Lab
- CT HQ - FFS - Skid Testing
Sample Information
| Sample Taken Date | 06/25/2023 | Sample Unique Key | 1 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 06/25/2023 | Sample type | Department Acceptance |
| A brief description of the sample | PCC | The quantity of what the sample constitutes | BRIDGE |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | HARISH |
| Last name of sampler or witnessed by | Thakur | Title of sampler | |
| Telephone number of sampler | 9152961873 | Laboratory sample identification | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | BRIDGE | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Roadway/Bridge Surface | Pavement Surface Type | Not set |
|---|---|---|---|
| Type of Traffic Control Provided | Not set | DIST-CO-RTE | Not set |
| Direction of Travel | Not set | Post Mile | Not set |
| Lanes to be Tested | Not set | Station | Not set |
Submitted Tests
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2023-06-25-1-1 CTM 342-August 2012 (Verified)
DIME Test ID: 2023-06-25-1-2 CTM 342-August 2012 (Verified)
DIME Test ID: 2023-06-25-1-3 CTM 342-August 2012 (Verified)