Project Details
This page displays current information for project DEA: 050L7214.
Project Information
Project Identifiers | Project ID: 214988 DEA: 050L7214 EFIS: 0515000097 |
---|---|
DIST-CO-RTE-PM | 05-SLO-1-32.6 |
Award Date | 03/08/2021 |
Closeout Date | Not set |
Work Description | REMOVE & CONSTRUCT CONCRETE BRIDGE, CONCRETE SLAB, BRIDGE RAIL & HMA. |
Location Description | SAN LUIS OBISPO COUNTY IN MORRO BAY AT TORO CREEK BRIDGE |
QA Service Level | 1 (Verified on 09/03/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
rick.silva@dot.ca.gov | Rick Silva | Resident Engineer | Caltrans RE DB |
sal.heredia@dot.ca.gov | Salvador Heredia | Structural Representative | Caltrans SR DB |
saman.barzegari@dot.ca.gov | Saman Barzegari | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 17 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-06-25-1 | 06/25/2023 | 06/25/2023 | Department Acceptance | Roadway/Bridge Surface | View |
2022-09-14-28 | 09/14/2022 | 09/16/2022 | Quality Assurance | SMTL TM7 - Epoxy Coated Rebar | View |
2022-07-27-2 | 07/27/2022 | 08/03/2022 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2022-05-17-2 | 05/17/2022 | Quality Control | SMTL TM5 - Welded Hoops | View | |
2022-05-17-1 | 05/17/2022 | 05/18/2022 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2022-05-06-6 | 05/06/2022 | Quality Control | SMTL TM5 - Headed Bars | View | |
2022-05-06-5 | 05/06/2022 | 05/09/2022 | Quality Assurance | SMTL TM5 - Headed Bars | View |
2022-05-06-4 | 05/06/2022 | Quality Control | SMTL TM5 - Headed Bars | View | |
2022-05-06-3 | 05/06/2022 | 05/09/2022 | Quality Assurance | SMTL TM5 - Headed Bars | View |
2022-04-29-4 | 04/29/2022 | 05/03/2022 | Quality Control | SMTL TM5 - Welded Hoops | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods