Summary for Test 2020-05-14-16-2

Test performed: AASHTO T30-19

Project Information

Project IdentifiersProject ID: 66667
DEA: JMFPP
EFIS: 0019000043
DIST-CO-RTE-PM59---
Award DateNot set
Closeout DateNot set
Work DescriptionSpecial project for submitting Sample information for JMF Prequalification Program.
Location DescriptionNot set
QA Service LevelNOT VERIFIED

Sample Information

Sample Taken Date05/14/2020 Sample Unique Key16
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing05/14/2020
Sample typeQuality Control A brief description of the sampleRAP - Chem 1
The quantity of what the sample constitutes1 From where was the sample collectedSource
First name of sampler or witnessed byMike Last name of sampler or witnessed byPaulson
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameVulcan Materials Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeReclaimed Asphalt Pavement RAP SourceVulcan Materials
Aggregate SizeUnknown Aggregate SourceUnknown
RAP Stockpile Stockpile Size (tons)Unknown
Reclaimed Asphalt Pavement Mix NumberNot set

Combined Gradation Report Information

Combined Gradation Report IdBin IndexDime Test Id
No assigned tests for this sample.

Test Details

DIME Sample ID: 2020-05-14-16
DIME Test ID: 2020-05-14-16-2
Testing Lab: Vulcan Materials Company - Pleasanton
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2020-05-16

Test Results


Does this test use 1/4 sieve?: Yes
Is an aggregate correction factor used?: No
Input Type: Calculated
Tester's full name: Mike Paulson
Date of test: 05/14/2020
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 100 %
Cumulative percent passing the 3/8 in. sieve: 100 %
Cumulative percent passing the 1/4 in. sieve: 100 %
Cumulative percent passing the #4 sieve: 83.5 %
Cumulative percent passing the #8 sieve: 63.4 %
Cumulative percent passing the #16 sieve: 46.2 %
Cumulative percent passing the #30 sieve: 34.4 %
Cumulative percent passing the #50 sieve: 24.7 %
Cumulative percent passing the #100 sieve: 17.1 %
Cumulative percent passing the #200 sieve: 12.2 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 5/16/2020