Summary for Test 2019-11-15-8-1
Test performed: AASHTO T30-15Project Information
Project Identifiers | DEA: No Project |
---|---|
DIST-CO-RTE-PM | --- |
Award Date | Not set |
Closeout Date | 11/01/2022 |
Work Description | Special project identifier for material not associated with a project |
Location Description | Not set |
QA Service Level | NOT VERIFIED |
Sample Information
Sample Taken Date | 11/15/2019 | Sample Unique Key | 8 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 11/15/2019 |
Sample type | Quality Control | A brief description of the sample | Combined Rap |
The quantity of what the sample constitutes | JMF Submittal | From where was the sample collected | Source |
First name of sampler or witnessed by | Sampler First Name | Last name of sampler or witnessed by | Sampler Last Name |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Vulcan Pleasanton | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Reclaimed Asphalt Pavement | RAP Source | Vulcan materials |
---|---|---|---|
Aggregate Size | 1/2-inch | Aggregate Source | |
RAP Stockpile | Stockpile Size (tons) | ||
Reclaimed Asphalt Pavement Mix Number | Not set |
Test Details
DIME Sample ID: 2019-11-15-8
DIME Test ID: 2019-11-15-8-1
Testing Lab: CT HQ - Sacramento Hot Mix Asphalt Laboratory
Test Method: AASHTO T30-15: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2019-11-16
Test Results
Input Type: Calculated
Tester's full name: Clinton Edmiston
Date of test: 11/15/2019
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 97 %
Cumulative percent passing the 3/8 in. sieve: 87 %
Cumulative percent passing the 1/4 in. sieve: 87 %
Cumulative percent passing the #4 sieve: 64 %
Cumulative percent passing the #8 sieve: 48 %
Cumulative percent passing the #16 sieve: 35 %
Cumulative percent passing the #30 sieve: 26 %
Cumulative percent passing the #50 sieve: 18 %
Cumulative percent passing the #100 sieve: 11 %
Cumulative percent passing the #200 sieve: 7.7 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 11/16/2019 ✔