Summary for Test 2024-04-16-5-1
Test performed: CTM 231-March 2013Project Information
Project Identifiers | Project ID: 994084 DEA: 060U8804 EFIS: 0616000074 |
---|---|
DIST-CO-RTE-PM | 06-TUL-99-26.3/27.6 |
Award Date | 01/23/2023 |
Closeout Date | Not set |
Work Description | CONSTRUCT A NEW INTERCHANGE AT COMMERCIAL AVENUE NOW CALLED INTERNATIONAL AGRI-CENTER WAY |
Location Description | ON STATE ROUTE 99 |
QA Service Level | 1 (Verified on 03/13/2023) |
Sample Information
Sample Taken Date | 04/16/2024 | Sample Unique Key | 5 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/16/2024 |
Sample type | Acceptance | A brief description of the sample | Native Borrow |
The quantity of what the sample constitutes | 40 lbs native material | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Corey | Last name of sampler or witnessed by | Hicks |
Title of sampler | Materials Tester | Telephone number of sampler | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | SPCI | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
---|---|---|---|
The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | CTM 231 test location | |
Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2024-04-16-5
DIME Test ID: 2024-04-16-5-1
Testing Lab: CT D06 - Bakersfield Field Laboratory
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2024-04-16
Test Results
Method Type:: Standard Count
Number of Tests:: 5
Common Test Maximum Used:: Yes
Input Type: Measured
Tester's full name: Corey Hicks
Date of test: 04/16/2024
Gage No.: 30695
Test No.: 75
Nuclear By: Corey Hicks
Non-Bias Plan No.: 1 odd
Depth: 8
Material No.: no data
Material Type: silty sand mod, BRN and F-gravel
Impact By: Jason Ruiz
Standard Count Density: 1766 g/cc
Count or Density 1: 1066 g/cc
Count or Density 2: 1028 g/cc
Count or Density 3: 1103 g/cc
Count or Density 4: 1146 g/cc
Count or Density 5: 1095 g/cc
Standard Count Moisture: 653 g/cc
Moisture Count 1: 144 g/cc
Moisture Count 2: 175 g/cc
Moisture Count 3: 147 g/cc
Moisture Count 4: 138 g/cc
Moisture Count 5: 174 g/cc
Density: 2.02
Moisture: 0.20
Sum of Count or Density: 5438.00 g/cc
Average of Count or Density: 1088.00 g/cc
Sum of Moisture Count: 778.00 g/cc
Average of Moisture Count: 156.00 g/cc
Count Ratio Density: 0.62
Count Ratio Moisture: 0.24
Calculated Percent Relative Compaction: 94.3 %
Reported Percent Relative Compaction: 94 %
General comments (publicly viewable) (Max 1000 characters): CR2 Sta 11+00 to 12+80 elevation: 13.5 ft BFG width: 100ft
Test File Attachments
File Name | Extension | File Size | Date Uploaded | Test ID | Actions |
---|---|---|---|---|---|
06-0U8804_37039_240416_75to81 | 1571.26 KB | 04/16/2024 | 2024-04-16-5-1 | Info |
Test was verified on 4/16/2024 ✔