Project Details
This page displays current information for project DEA: 060U8804.
Project Information
Project Identifiers | Project ID: 994084 DEA: 060U8804 EFIS: 0616000074 |
---|---|
DIST-CO-RTE-PM | 06-TUL-99-26.3/27.6 |
Award Date | 01/23/2023 |
Closeout Date | Not set |
Work Description | CONSTRUCT A NEW INTERCHANGE AT COMMERCIAL AVENUE NOW CALLED INTERNATIONAL AGRI-CENTER WAY |
Location Description | ON STATE ROUTE 99 |
QA Service Level | 1 (Verified on 03/13/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
alberto.lopez@dot.ca.gov | Alberto Lopez | Resident Engineer | Caltrans RE DB |
vicente.sanchez@dot.ca.gov | Vicente Sanchez | Structural Representative | Caltrans SR DB |
justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 586 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2025-05-15-1 | 05/15/2025 | 05/15/2025 | Quality Assurance | Soil | View |
2025-04-30-62 | 04/30/2025 | 05/01/2025 | Quality Assurance | Concrete | View |
2025-04-30-61 | 04/30/2025 | 05/01/2025 | Quality Assurance | Concrete | View |
2025-04-28-64 | 04/28/2025 | 04/29/2025 | Quality Assurance | Concrete | View |
2025-04-28-63 | 04/28/2025 | 04/29/2025 | Quality Assurance | Concrete | View |
2025-04-28-62 | 04/28/2025 | 04/29/2025 | Quality Assurance | Concrete | View |
2025-04-30-45 | 04/30/2025 | 04/30/2025 | Quality Assurance | Aggregate | View |
2025-04-30-44 | 04/30/2025 | 04/30/2025 | Quality Assurance | Aggregate | View |
2025-04-28-52 | 04/28/2025 | 04/28/2025 | Quality Assurance | Aggregate | View |
2025-03-20-48 | 03/20/2025 | 03/20/2025 | Quality Assurance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Precast Concrete Forms
Project DEA | DIME Sample ID | Sample Taken Date | Link |
---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods