Summary for Test 2024-04-05-6-1
Test performed: AASHTO T30-19Project Information
Project Identifiers | DEA: No Project |
---|---|
DIST-CO-RTE-PM | --- |
Award Date | Not set |
Closeout Date | 11/01/2022 |
Work Description | Special project identifier for material not associated with a project |
Location Description | Not set |
QA Service Level | NOT VERIFIED |
Sample Information
Sample Taken Date | 04/05/2024 | Sample Unique Key | 6 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 04/05/2024 |
Sample type | Quality Control | A brief description of the sample | mainline 2 |
The quantity of what the sample constitutes | 150 Cy | From where was the sample collected | Job Site |
First name of sampler or witnessed by | John | Last name of sampler or witnessed by | Teng |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Teichert | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
---|---|---|---|
HMA Grading | 3/4 inch | Lot number | 1 |
Sublot number | 1 | HMA Mix Number |
Test Details
DIME Sample ID: 2024-04-05-6
DIME Test ID: 2024-04-05-6-1
Testing Lab: CT HQ - Sacramento Materials Management Branch Field Office
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2024-04-05
Test Results
Does this test use 1/4 sieve?: No
Is an aggregate correction factor used?: No
Input Type: Calculated
Tester's full name: Alexis Corona
Date of test: 04/08/2024
Cumulative percent passing the 2 in. sieve: 98 %
Cumulative percent passing the 1 1/2 in. sieve: 95 %
Cumulative percent passing the 1 in. sieve: 85 %
Cumulative percent passing the 3/4 in. sieve: 75 %
Cumulative percent passing the 1/2 in. sieve: 70 %
Cumulative percent passing the 3/8 in. sieve: 65 %
Cumulative percent passing the #4 sieve: 60 %
Cumulative percent passing the #8 sieve: 55 %
Cumulative percent passing the #16 sieve: 45 %
Cumulative percent passing the #30 sieve: 30 %
Cumulative percent passing the #50 sieve: 25 %
Cumulative percent passing the #100 sieve: 10 %
Cumulative percent passing the #200 sieve: 5.5 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 4/5/2024 ✔