Summary for Test 2024-02-29-19-3
Test performed: CTM 521-June 2020Project Information
Project Identifiers | Project ID: 994109 DEA: 060W1704 EFIS: 0617000103 |
---|---|
DIST-CO-RTE-PM | 06-FRE-41-R27.4/R28.5 |
Award Date | 11/10/2022 |
Closeout Date | Not set |
Work Description | REMOVE AC PAVEMENT, WIDEN TRAVEL WAY, AND CONSTRUCT RETAINING WALL. |
Location Description | FRESNO COUNTY IN FRESNO FROM 0.1 MILE SOUTH OF ASHLAN AVENUE OVERCROSSING TO SHAW AVENUE OVERCROSSING |
QA Service Level | 1 (Verified on 07/13/2022) |
Sample Information
Sample Taken Date | 02/29/2024 | Sample Unique Key | 19 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 03/01/2024 |
Sample type | Department Acceptance | A brief description of the sample | 7.18sk 1AGG FA WD |
The quantity of what the sample constitutes | 123.5cy | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Gerzon | Last name of sampler or witnessed by | Ceja |
Title of sampler | ASR | Telephone number of sampler | 5599172487 |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Builders Concrete Ready Mix Plant Sanger | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name | Hwy 41 AUX LANE |
Material Information
Material Type | Concrete | The concrete mix design number | ND22023 |
---|---|---|---|
The truck number from where the sample was collected | 9227 | The batch plant ticket number from where the sample was collected | 111338179 |
Concrete batch plant | Builders Concrete | The fabricator/manufacturer designation for the sample | Mix |
A detailed description of where the material sample was collected | wheelbarrow | Where the material sample would have been placed if not sampled | Retaining wall |
From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2024-02-29-19
DIME Test ID: 2024-02-29-19-3
Testing Lab: CT D06 - Millbrook Field Laboratory
Test Method: CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete Cylinders
Test Release Date: 2024-03-28
Test Results
Unit system used?: US Units
Number of specimens: 3
Test performed: With no density determined
Input Type: Measured
Tester's full name: Tomas Silva
Date of test: 03/28/2024
Capped in accordance with?: ASTM C1231 - Unbonded Elastomeric Pad Cap
Average diameter of cylinder 1: 4.01 in
Average diameter of cylinder 2: 4.00 in
Average diameter of cylinder 3: 4.01 in
Maximum load on cylinder 1: 89110 lb
Maximum load on cylinder 2: 85780 lb
Maximum load on cylinder 3: 88740 lb
Type of fracture pattern of cylinder 1: 2
Type of fracture pattern of cylinder 2: 3
Type of fracture pattern of cylinder 3: 2
Comment on any defect in either specimen or caps (Max 250 Characters): no data
Correction factor for cylinder 1: 1
Correction factor for cylinder 2: 1
Correction factor for cylinder 3: 1
Age of specimen: 28 days
Age of specimen in hours: 0 hours
Cross sectional area of cylinder 1: 12.63 in^2
Cross sectional area of cylinder 2: 12.57 in^2
Cross sectional area of cylinder 3: 12.63 in^2
Compressive strength of cylinder 1: 7055.4 psi
Compressive strength of cylinder 2: 6824.2 psi
Compressive strength of cylinder 3: 7026.1 psi
Compressive strength (to nearest 10 psi): 6970 psi
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 3/28/2024 ✔