Summary for Test 2023-12-14-5-1
Test performed: CTM 342-August 2012Project Information
Project Identifiers | Project ID: 994310 DEA: 034F6504 EFIS: 0314000233 |
---|---|
DIST-CO-RTE-PM | 03-YOL-50,80-0.0/2.5,4.1/R11.4 |
Award Date | 04/07/2023 |
Closeout Date | Not set |
Work Description | CRCP, HMA (TYPE A), RDWY EXC, CLASS 2 AB, FIBER OPTIC CABLE SYSTEMS. |
Location Description | YOLO COUNTY IN AND NEAR WEST SACRAMENTO ON ROUTE 80 FROM 1.7 MILES EAST OF MACE BOULEVARD OVERCROSSING TO SACRAMENTO RIVER BRIDGE AND OVERHEAD (BRYTE BEND) AND ON ROUTE 50 FROM ROUTE 80 JUNCTION TO JEFFERSON BOULEVARD UNDERCROSSING |
QA Service Level | 1 (Verified on 10/04/2022) |
Sample Information
Sample Taken Date | 12/14/2023 | Sample Unique Key | 5 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 12/14/2023 |
Sample type | Department Acceptance | A brief description of the sample | TRIAL SLAB |
The quantity of what the sample constitutes | TRIAL SLAB | From where was the sample collected | Job Site |
First name of sampler or witnessed by | HARISH | Last name of sampler or witnessed by | THAKUR |
Title of sampler | Telephone number of sampler | 9152961873 | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | JOB SITE | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Roadway/Bridge Surface | Pavement Surface Type | Polyester Concrete |
---|---|---|---|
Type of Traffic Control Provided | N/A | DIST-CO-RTE | |
Direction of Travel | Post Mile | ||
Lanes to be Tested | Station |
Test Details
DIME Sample ID: 2023-12-14-5
DIME Test ID: 2023-12-14-5-1
Testing Lab: CT HQ - FFS - Skid Testing
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2023-12-15
Test Results
Pavement or Bridge Deck?: Bridge Deck
Input Type: Measured
Tester's full name: Harish Thakur
Date of test: 12/15/2023
Air Temperature: 42
Tire Pressure: 25
Equipment PST #: 1000-7/1000-8
Is Calibration within ± values: Yes
Weather: SUNNY
Direction/Lane #: EB: Eastbound Direction of Travel
Edge used to measure reference distance: BEGIN TEST PANEL
Edge used to measure position: RIGHT OF EDGE
Reference Distance 1: 2
Reference Distance 2: 5
Reference Distance 3: 8
Direction and Lane # for Stationing 1: no data
Direction and Lane # for Stationing 2: no data
Direction and Lane # for Stationing 3: no data
Position for Stationing 1: 3
Position for Stationing 2: 3
Position for Stationing 3: 3
Percent Grade for 1st Stationing: 0.0
Percent Grade for 2nd Stationing: 0.0
Percent Grade for 3rd Stationing: 0.0
Corrected Coefficients of Friction for Stationing 1: 0.41
Corrected Coefficients of Friction for Stationing 2: 0.40
Corrected Coefficients of Friction for Stationing 3: 0.40
Average Coefficient of Friction: 0.40
General comments (publicly viewable) (Max 1000 characters): TEST PANEL/POLY
Test was verified on 12/15/2023 ✔