Project Details

This page displays current information for project DEA: 034F6504.

Project Information

Project IdentifiersProject ID: 994310
DEA: 034F6504
EFIS: 0314000233
DIST-CO-RTE-PM03-YOL-50,80-0.0/2.5,4.1/R11.4
Award Date04/07/2023
Closeout DateNot set
Work DescriptionCRCP, HMA (TYPE A), RDWY EXC, CLASS 2 AB, FIBER OPTIC CABLE SYSTEMS.
Location DescriptionYOLO COUNTY IN AND NEAR WEST SACRAMENTO ON ROUTE 80 FROM 1.7 MILES EAST OF MACE BOULEVARD OVERCROSSING TO SACRAMENTO RIVER BRIDGE AND OVERHEAD (BRYTE BEND) AND ON ROUTE 50 FROM ROUTE 80 JUNCTION TO JEFFERSON BOULEVARD UNDERCROSSING
QA Service Level1 (Verified on 10/04/2022)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
brent.bullard@dot.ca.govBrent BullardStructural RepresentativeCaltrans SR DB
donald.adams@dot.ca.govDonald AdamsMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Displaying 1-10 of 51 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
2024-04-16-1704/16/202404/16/2024Quality AssuranceSMTL TM5 - CouplersView
2024-04-08-3204/08/2024Quality AssuranceHot Mix AsphaltView
2024-04-08-7004/08/202404/24/2024Quality AssuranceHot Mix AsphaltView
2024-03-08-4303/08/202403/15/2024Quality AssuranceConcreteView
2024-02-29-1802/29/202403/01/2024Quality AssuranceConcreteView
2024-02-27-902/27/202403/01/2024Quality AssuranceConcreteView
2024-02-01-102/01/202402/02/2024Quality AssuranceSMTL TM3 - Fastener AssemblyView
2023-12-14-512/14/202312/14/2023AcceptanceRoadway/Bridge SurfaceView
2023-12-14-4112/14/202312/14/2023Quality ControlAggregateView
2023-12-09-412/09/202312/09/2023Quality ControlAggregateView

Job Mix Formula (JMF)

JMFs associated with this project.

Displaying 1-2 of 2 results.
JMF IDStatusSubmitted ByCreated ByDate CreatedLink
JMF3511-23-2024-26Submittal Authorized For Use CT D03 - Olivehurst Northern Regional Laboratory04/02/2024View
JMF3511-23-2023-57Submittal Authorized For Use CT D03 - Olivehurst Northern Regional Laboratory11/06/2023View

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Displaying 1-10 of 22 results.
Declaration NumberMaterial TypeVendorSubmitted byQuantity
EPD-191Carbon Steel RebarCMC - MesaCMC Rebar (TAMMY ARAGON)48144 lbs
EPD-191Carbon Steel RebarCMC - MesaCMC Rebar (TAMMY ARAGON)48144 lbs
EPD-191Carbon Steel RebarCMC - MesaCMC Rebar (TAMMY ARAGON)48144 lbs
EPD-191Carbon Steel RebarCMC - MesaCMC Rebar (TAMMY ARAGON)48144 lbs
EPD-191Carbon Steel RebarCMC - MesaCMC Rebar (TAMMY ARAGON)48144 lbs
EPD-191Carbon Steel RebarCMC - MesaCMC Rebar (TAMMY ARAGON)48144 lbs
EPD-191Carbon Steel RebarCMC - MesaCMC Rebar (TAMMY ARAGON)48144 lbs
EPD-191Carbon Steel RebarCMC - MesaCMC Rebar (TAMMY ARAGON)48144 LBS
EPD-191Carbon Steel RebarCMC - MesaCMC Rebar (TAMMY ARAGON)48144 LBS
EPD-191Carbon Steel RebarCMC - MesaCMC Rebar (TAMMY ARAGON)48144 LBS

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods