Summary for Test 2023-08-09-45-3
Test performed: ASTM C39-21Project Information
Project Identifiers | Project ID: 212112 DEA: 080C2514 EFIS: 0816000076 COOP: 081645 |
---|---|
DIST-CO-RTE-PM | 08-SBD-10-0.0/13.2 |
Award Date | 06/06/2018 |
Closeout Date | Not set |
Work Description | Design-Build of I-10 Corridor Contract 1 - Adding 2 new Express Lanes |
Location Description | LA/SBD County Line to PM 13.2 near I-15 |
QA Service Level | 1 (Verified on 10/16/2019) |
Sample Information
Sample Taken Date | 08/09/2023 | Sample Unique Key | 45 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/10/2023 |
Sample type | Quality Assurance | A brief description of the sample | Concrete Cylinders |
The quantity of what the sample constitutes | 8 | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Fernando | Last name of sampler or witnessed by | Carranza |
Title of sampler | QA | Telephone number of sampler | |
Laboratory sample identification | 1015-080 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Lane Security Joint Venture | Transportation Laboratory (TL) Number | 1 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | 1610887 |
---|---|---|---|
The truck number from where the sample was collected | 10067783 | The batch plant ticket number from where the sample was collected | 30872285 |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | Monte Vista Ave UC Stage 2B Deck | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2023-08-09-45
DIME Test ID: 2023-08-09-45-3
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: ASTM C39-21: Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
Test Release Date: 2023-09-11
Test Results
Unit system used?: US Units
Number of specimens: 2
Test performed: With no density determined
Input Type: Measured
Tester's full name: Matthew Clayton
Date of test: 09/05/2023
Capped in accordance with?: no data
Apparent mass of submerged cylinder 1: 0 lb
Average diameter of cylinder 1: 5.98 in
Average diameter of cylinder 2: 5.99 in
Maximum load on cylinder 1: 138530 lb
Maximum load on cylinder 2: 137620 lb
Type of fracture pattern of cylinder 1: 1
Type of fracture pattern of cylinder 2: 2
Comment on any defect in either specimen or caps (Max 250 Characters): no data
Correction factor for cylinder 1: 1
Correction factor for cylinder 2: 1
Age of specimen: 28 days
Age of specimen in hours: 0 hours
Cross sectional area of cylinder 1: 28.09 in^2
Cross sectional area of cylinder 2: 28.18 in^2
Compressive strength of cylinder 1: 4930.0 psi
Compressive strength of cylinder 2: 4880.0 psi
Compressive strength (to nearest 10 psi): 4910 psi
Serial number of delivery ticket, if available: no data
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 9/11/2023 ✔