Summary for Test 2023-07-26-5-2

Test performed: ASTM C138-17a

Project Information

Project IdentifiersProject ID: 215003
DEA: 040J6204
EFIS: 0414000019
DIST-CO-RTE-PM04-ALA-680-12.4/21.9
Award Date04/12/2022
Closeout DateNot set
Work DescriptionREHABILITATE PAVEMENT - RPL APP/DEP SLABS, 14 BRIDGES
Location DescriptionALAMEDA COUNTY AT SUNOL AND IN PLEASANTON AND DUBLIN FROM KOOPMANN ROAD UNDERCROSSING TO ALAMEDA COUNTY LINE
QA Service Level1 (Verified on 10/19/2020)

Sample Information

Sample Taken Date07/26/2023 Sample Unique Key5
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing07/27/2023
Sample typeQuality Control A brief description of the sample1 cubic ft. of Concrete taken from middle of batching
The quantity of what the sample constitutes1 cubic ft. of Concrete for Testing From where was the sample collectedFabricator
First name of sampler or witnessed byPJ Last name of sampler or witnessed byWright
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameCon-Fab California, LLC Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeConcrete The concrete mix design number85LV-1K
The truck number from where the sample was collected The batch plant ticket number from where the sample was collected9170 - 9155
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedBed 4, 8th Truck - Bed Delta, 6th Truck Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2023-07-26-5
DIME Test ID: 2023-07-26-5-2
Testing Lab: Con-Fab California Corporation - Lathrop
Test Method: ASTM C138-17a: Standard Test Method for Density (Unit Weight), Yield, and Air Content (Gravimetric) of Concrete
Test Release Date: 2023-07-27

Test Results


Input Type: Calculated
Tester's full name: Mauril Mariano
Date of test: 07/26/2023
Identification of concrete represented by the sample: Bed 4, 8th Truck
Volume of the measure: 0.25 ft^3
Density of concrete: 150.1 lb/ft^3
Yield of concrete: no data
Relative yield of the batch: no data
Cement content: no data
Air content: 2.2 %
General comments (publicly viewable) (Max 1000 characters): Bed 4 & DELTA

Test was verified on 7/27/2023