Project Details
This page displays current information for project DEA: 040J6204.
Project Information
Project Identifiers | Project ID: 215003 DEA: 040J6204 EFIS: 0414000019 |
---|---|
DIST-CO-RTE-PM | 04-ALA-680-12.4/21.9 |
Award Date | 04/12/2022 |
Closeout Date | Not set |
Work Description | REHABILITATE PAVEMENT - RPL APP/DEP SLABS, 14 BRIDGES |
Location Description | ALAMEDA COUNTY AT SUNOL AND IN PLEASANTON AND DUBLIN FROM KOOPMANN ROAD UNDERCROSSING TO ALAMEDA COUNTY LINE |
QA Service Level | 1 (Verified on 10/19/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
betty.geng@dot.ca.gov | Betty Geng | Structural Representative | Caltrans SR DB |
dylan.larose@dot.ca.gov | Dylan Larose | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 276 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-08-01-28 | 08/01/2023 | 08/02/2023 | Quality Control | Concrete | View |
2023-07-31-8 | 07/31/2023 | 08/01/2023 | Quality Control | Concrete | View |
2023-07-28-25 | 07/28/2023 | 07/31/2023 | Quality Control | Concrete | View |
2023-07-27-8 | 07/27/2023 | 07/28/2023 | Quality Control | Concrete | View |
2023-07-26-5 | 07/26/2023 | 07/27/2023 | Quality Control | Concrete | View |
2023-07-25-5 | 07/25/2023 | 07/26/2023 | Quality Control | Concrete | View |
2023-07-24-6 | 07/24/2023 | 07/25/2023 | Quality Control | Concrete | View |
2023-07-21-15 | 07/21/2023 | 07/24/2023 | Quality Control | Concrete | View |
2023-07-20-7 | 07/20/2023 | 07/20/2023 | Quality Control | Concrete | View |
2023-07-19-16 | 07/19/2023 | 07/20/2023 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods