Summary for Test 2023-06-07-49-4

Test performed: AASHTO T269-14

Project Information

Project IdentifiersProject ID: 993118
DEA: 101C3304
EFIS: 1014000146
DIST-CO-RTE-PM10-SJ-205-R4.6/R9.0
Award Date04/05/2022
Closeout DateNot set
Work DescriptionWidening bridges, ramps and roadway. SR205 SMART CORRIDOR - PHASE 2
Location DescriptionOn state highway in San Joaquin County in and near Tracy from Janney Overhead to 1.3 miles east of MacArthur Drive Overcrossing.
QA Service Level1 (Verified on 07/06/2022)

Sample Information

Sample Taken Date06/07/2023 Sample Unique Key49
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing06/08/2023
Sample typeQuality Assurance A brief description of the sample3/4 HMA
The quantity of what the sample constitutes32 boxes From where was the sample collectedManufacturer
First name of sampler or witnessed byTimothy Last name of sampler or witnessed byTrefz
Title of samplerMREA Telephone number of sampler
Laboratory sample identification23-H-88B Linked DIME Sample ID
The fabricator/manufacturer/facility nameTeichert Materials Vernalis Transportation Laboratory (TL) Number994673
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeHot Mix Asphalt HMA TypeType A HMA
HMA Grading3/4 inch Lot number1
Sublot number2 HMA Mix Number22J22

Test Details

DIME Sample ID: 2023-06-07-49
DIME Test ID: 2023-06-07-49-4
Testing Lab: CT D10 - District 10 Materials Laboratory
Test Method: AASHTO T269-14: Standard Method of Test for Percent Air Voids in Compacted Dense and Open Asphalt Mixtures (Air Void)
Test Release Date: 2023-06-16

Test Results


Number of tests: 1
Input Type: Calculated
Tester's full name: Hans Camenzind
Date of test: 06/15/2023
Percent Air Voids: 12.7 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 6/16/2023