Project Details
This page displays current information for project DEA: 101C3304.
Project Information
Project Identifiers | Project ID: 993118 DEA: 101C3304 EFIS: 1014000146 |
---|---|
DIST-CO-RTE-PM | 10-SJ-205-R4.6/R9.0 |
Award Date | 04/05/2022 |
Closeout Date | Not set |
Work Description | Widening bridges, ramps and roadway. SR205 SMART CORRIDOR - PHASE 2 |
Location Description | On state highway in San Joaquin County in and near Tracy from Janney Overhead to 1.3 miles east of MacArthur Drive Overcrossing. |
QA Service Level | 1 (Verified on 07/06/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
chris.hanson@dot.ca.gov | Chris Hanson | Resident Engineer | Caltrans RE DB |
ron.matin@dot.ca.gov | Ron Matin | Structural Representative | Caltrans SR DB |
andre.totari@dot.ca.gov | Andre Totari | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 24 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-11-07-66 | 11/07/2023 | 11/13/2023 | Quality Control | Asphalt Binder | View |
2023-11-07-67 | 11/07/2023 | 11/13/2023 | Quality Control | Asphalt Binder | View |
2023-11-02-47 | 11/02/2023 | 11/13/2023 | Quality Control | Asphalt Binder | View |
2023-11-01-71 | 11/01/2023 | 11/13/2023 | Quality Control | Asphalt Binder | View |
2023-10-31-68 | 10/31/2023 | 11/13/2023 | Quality Control | Asphalt Binder | View |
2023-09-25-6 | 09/25/2023 | 09/27/2023 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2023-09-25-7 | 09/25/2023 | Quality Assurance | SMTL TM5 - Welded Hoops | View | |
2023-07-24-56 | 07/24/2023 | 07/25/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-07-24-57 | 07/24/2023 | 07/25/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-07-24-58 | 07/24/2023 | 07/27/2023 | Quality Assurance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods