Summary for Test 2023-03-26-5-2
Test performed: AASHTO T308-10Project Information
Project Identifiers | Project ID: 994501 DEA: 072XE904 EFIS: 0723000103 |
---|---|
DIST-CO-RTE-PM | 07-LA-71-R1.52/1.60 |
Award Date | 02/16/2023 |
Closeout Date | 01/11/2024 |
Work Description | Saw cut around the localized failed area (digouts) to remove the AC pavement, replace with HMA-A and replace any pavement delineation and pavement markers that are removed. |
Location Description | In Los Angeles County, in the City of Pomona, on both the southbound and northbound directions of LA 71, from Valley Blvd (PM R1.52) to Mission Blvd (PM 1.60). |
QA Service Level | 1 (Verified on 07/24/2023) |
Sample Information
Sample Taken Date | 03/26/2023 | Sample Unique Key | 5 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 03/27/2023 |
Sample type | Acceptance | A brief description of the sample | 3/4" HMA-A 36R2508SPWEO |
The quantity of what the sample constitutes | 1000 tons | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Victor | Last name of sampler or witnessed by | Pham |
Title of sampler | TET | Telephone number of sampler | |
Laboratory sample identification | 23-032 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | RJ Noble Orange | Transportation Laboratory (TL) Number | 0326C2 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
---|---|---|---|
HMA Grading | 3/4 inch | Lot number | |
Sublot number | HMA Mix Number | 36R2508SPWEO |
Test Details
DIME Sample ID: 2023-03-26-5
DIME Test ID: 2023-03-26-5-2
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2023-04-13
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Robert Achuela
Date of test: 03/29/2023
Test procedure used?: Method A
Mass of the specimen basket assembly: 4014.3 g
Mass of the specimen and specimen basket assembly prior to ignition: 6034.8 g
Mass of HMA Sample prior to ignition: 2020.5 g
Mass Loss: 110.3 g
Mass of aggregate remaining after ignition: 1910.2 g
Correction Factor (Percent by mass of HMA Specimen): 0.34 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.00 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 5.12 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 4/13/2023 ✔