Summary for Test 2023-03-26-5-2

Test performed: AASHTO T308-10

Project Information

Project IdentifiersProject ID: 994501
DEA: 072XE904
EFIS: 0723000103
DIST-CO-RTE-PM07-LA-71-R1.52/1.60
Award Date02/16/2023
Closeout Date01/11/2024
Work DescriptionSaw cut around the localized failed area (digouts) to remove the AC pavement, replace with HMA-A and replace any pavement delineation and pavement markers that are removed.
Location DescriptionIn Los Angeles County, in the City of Pomona, on both the southbound and northbound directions of LA 71, from Valley Blvd (PM R1.52) to Mission Blvd (PM 1.60).
QA Service Level1 (Verified on 07/24/2023)

Sample Information

Sample Taken Date03/26/2023 Sample Unique Key5
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing03/27/2023
Sample typeAcceptance A brief description of the sample3/4" HMA-A 36R2508SPWEO
The quantity of what the sample constitutes1000 tons From where was the sample collectedManufacturer
First name of sampler or witnessed byVictor Last name of sampler or witnessed byPham
Title of samplerTET Telephone number of sampler
Laboratory sample identification23-032 Linked DIME Sample ID
The fabricator/manufacturer/facility nameRJ Noble Orange Transportation Laboratory (TL) Number0326C2
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeHot Mix Asphalt HMA TypeType A HMA
HMA Grading3/4 inch Lot number
Sublot number HMA Mix Number36R2508SPWEO

Test Details

DIME Sample ID: 2023-03-26-5
DIME Test ID: 2023-03-26-5-2
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2023-04-13

Test Results


What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Robert Achuela
Date of test: 03/29/2023
Test procedure used?: Method A
Mass of the specimen basket assembly: 4014.3 g
Mass of the specimen and specimen basket assembly prior to ignition: 6034.8 g
Mass of HMA Sample prior to ignition: 2020.5 g
Mass Loss: 110.3 g
Mass of aggregate remaining after ignition: 1910.2 g
Correction Factor (Percent by mass of HMA Specimen): 0.34 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.00 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 5.12 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 4/13/2023