This page displays current information for project DEA: 072XE904.

Project Information

Project IdentifiersProject ID: 994501
DEA: 072XE904
EFIS: 0723000103
DIST-CO-RTE-PM07-LA-71-R1.52/1.60
Award Date02/16/2023
Closeout Date01/11/2024
Work DescriptionSaw cut around the localized failed area (digouts) to remove the AC pavement, replace with HMA-A and replace any pavement delineation and pavement markers that are removed.
Location DescriptionIn Los Angeles County, in the City of Pomona, on both the southbound and northbound directions of LA 71, from Valley Blvd (PM R1.52) to Mission Blvd (PM 1.60).
QA Service Level1 (Verified on 07/24/2023)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
hai.hong@dot.ca.govHai HongResident EngineerCaltrans RE DB
jeffrey.yu@dot.ca.govJeffrey YuMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Displaying 1-10 of 22 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2023-03-25-2603/25/202304/13/2023InformationalHot Mix AsphaltView
2023-03-25-2503/25/202304/13/2023InformationalHot Mix AsphaltView
2023-12-01-2612/01/202312/07/2023Quality AssuranceConcreteView
2023-03-26-703/26/202303/28/2023Department AcceptanceAggregateView
2023-03-28-3103/28/202303/28/2023Department AcceptanceHot Mix AsphaltView
2023-03-27-5303/27/202303/28/2023Department AcceptanceHot Mix AsphaltView
2023-03-25-1903/25/202303/28/2023Department AcceptanceHot Mix AsphaltView
2023-03-26-503/26/202303/27/2023Department AcceptanceHot Mix AsphaltView
2023-03-26-403/26/202303/27/2023Department AcceptanceHot Mix AsphaltView
2023-03-24-4203/24/202302/27/2023Department AcceptanceHot Mix AsphaltView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.