Summary for Test 2023-03-25-12-2

Test performed: AASHTO T240-17

Project Information

Project IdentifiersProject ID: 994501
DEA: 072XE904
EFIS: 0723000103
DIST-CO-RTE-PM07-LA-71-R1.52/1.60
Award Date02/16/2023
Closeout Date01/11/2024
Work DescriptionSaw cut around the localized failed area (digouts) to remove the AC pavement, replace with HMA-A and replace any pavement delineation and pavement markers that are removed.
Location DescriptionIn Los Angeles County, in the City of Pomona, on both the southbound and northbound directions of LA 71, from Valley Blvd (PM R1.52) to Mission Blvd (PM 1.60).
QA Service Level1 (Verified on 07/24/2023)

Sample Information

Sample Taken Date03/25/2023 Sample Unique Key12
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing03/29/2023
Sample typePer Request A brief description of the samplePG Asphalt Binder
The quantity of what the sample constitutes1 Quart Can From where was the sample collectedSupplier
First name of sampler or witnessed byBaher Last name of sampler or witnessed byFakhoury
Title of sampler Telephone number of sampler
Laboratory sample identification0185-23 Linked DIME Sample ID
The fabricator/manufacturer/facility nameRJ Noble-Orange Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAsphalt Binder Performance GradePG 58-22
ModifiedNo Lot number
Sublot number Tank number
Time of sample HMA Supplier
Certified Asphalt SupplierLunday Thagard Company-World Oil - South Gate CA MultigradeNo
Multigrade Type Asphalt Binder Mix Number

Test Details

DIME Sample ID: 2023-03-25-12
DIME Test ID: 2023-03-25-12-2
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2023-04-30

Test Results


Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Sm Ali
Date of test: 04/03/2023
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 172.723 grams
Mass of empty container #2: 176.518 grams
Mass of container #1 before test (m1i): 207.570 grams
Mass of container #2 before test (m2i): 211.481 grams
Mass of container #1 after test (m1f): 207.559 grams
Mass of container #2 after test (m2f): 211.468 grams
Average mass change: -0.034 percent
General comments (publicly viewable) (Max 1000 characters): - 0.034 + 0.006 = - 0.028

Test was verified on 4/30/2023