Summary for Test 2023-03-23-8-2
Test performed: AASHTO T240-17Project Information
Project Identifiers | Project ID: 993491 DEA: 07336504 EFIS: 0716000401 |
---|---|
DIST-CO-RTE-PM | 07-LA-110-3.9/5.9 |
Award Date | 03/08/2022 |
Closeout Date | Not set |
Work Description | PLACE STAMPED CONCRETE, CONSTRUCT MVPS AND ACCESS ROADS. |
Location Description | LOS ANGELES COUNTY IN AND NEAR LOS ANGELES AND CARSON AT VARIOUS LOCATIONS FROM 0.2 MILE SOUTH OF ROUTE 110/1 SEPARATION TO 0.4 MILE NORTH OF SEPULVEDA BOULEVARD UNDERCROSSING. |
QA Service Level | 1 (Verified on 04/19/2022) |
Sample Information
Sample Taken Date | 03/23/2023 | Sample Unique Key | 8 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 03/27/2023 |
Sample type | Per Request | A brief description of the sample | PG Asphalt Binder |
The quantity of what the sample constitutes | 1 Quart Can | From where was the sample collected | Supplier |
First name of sampler or witnessed by | Gerry | Last name of sampler or witnessed by | Zubieta |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | 0182-23 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Vulcan-Irwindale | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Asphalt Binder | Performance Grade | PG 64-16 |
---|---|---|---|
Modified | No | Lot number | |
Sublot number | Tank number | ||
Time of sample | HMA Supplier | ||
Certified Asphalt Supplier | Lunday Thagard Company-World Oil - South Gate CA | Multigrade | Yes |
Multigrade Type | PG 64-16 / PG 64-10 | Asphalt Binder Mix Number |
Test Details
DIME Sample ID: 2023-03-23-8
DIME Test ID: 2023-03-23-8-2
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2023-04-30
Test Results
Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Sm Ali
Date of test: 03/28/2023
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 167.270 grams
Mass of empty container #2: 169.567 grams
Mass of container #1 before test (m1i): 201.892 grams
Mass of container #2 before test (m2i): 204.566 grams
Mass of container #1 after test (m1f): 201.868 grams
Mass of container #2 after test (m2f): 204.543 grams
Average mass change: -0.068 percent
General comments (publicly viewable) (Max 1000 characters): - 0.068 + 0.006 = - 0.062
Test was verified on 4/30/2023 ✔