Project Details
This page displays current information for project DEA: 07336504.
Project Information
Project Identifiers | Project ID: 993491 DEA: 07336504 EFIS: 0716000401 |
---|---|
DIST-CO-RTE-PM | 07-LA-110-3.9/5.9 |
Award Date | 03/08/2022 |
Closeout Date | 09/24/2024 |
Work Description | PLACE STAMPED CONCRETE, CONSTRUCT MVPS AND ACCESS ROADS. |
Location Description | LOS ANGELES COUNTY IN AND NEAR LOS ANGELES AND CARSON AT VARIOUS LOCATIONS FROM 0.2 MILE SOUTH OF ROUTE 110/1 SEPARATION TO 0.4 MILE NORTH OF SEPULVEDA BOULEVARD UNDERCROSSING. |
QA Service Level | 1 (Verified on 04/19/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
thang.ton@dot.ca.gov | Thang Ton | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-7 of 7 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-03-16-28 | 03/16/2023 | 03/17/2023 | Department Acceptance | Aggregate | View |
2023-03-16-27 | 03/16/2023 | 03/17/2023 | Department Acceptance | Aggregate | View |
2023-05-26-5 | 05/26/2023 | 05/26/2023 | Department Acceptance | Soil | View |
2023-05-26-4 | 05/26/2023 | 05/26/2023 | Department Acceptance | Soil | View |
2023-03-23-21 | 03/23/2023 | 03/29/2023 | Department Acceptance | Hot Mix Asphalt | View |
2023-03-23-9 | 03/23/2023 | 03/27/2023 | Verification | Aggregate | View |
2023-03-23-8 | 03/23/2023 | 03/27/2023 | Per Request | Asphalt Binder | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods