Summary for Test 2023-02-02-43-2
Test performed: CTM 342-August 2012Project Information
Project Identifiers | Project ID: 211183 DEA: 062HT014 EFIS: 0613000318 COOP: HSR1446 |
---|---|
DIST-CO-RTE-PM | 06-FRE-145,99(var),180,41-various |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Construct crossings in Madera and Fresno for High Speed Rail project: SR 145, SR 99, SR 180, SR 41. |
Location Description | Madera and Fresno Counties; HST crossings at SR 145, SR 99, SR 180, SR 41. |
QA Service Level | 2 (Verified on 02/04/2016) |
Sample Information
Sample Taken Date | 02/02/2023 | Sample Unique Key | 43 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 02/02/2023 |
Sample type | Acceptance | A brief description of the sample | BRIDGE DECK |
The quantity of what the sample constitutes | 66FT LONG | From where was the sample collected | Job Site |
First name of sampler or witnessed by | HARISH | Last name of sampler or witnessed by | Thakur |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | CT | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Roadway/Bridge Surface | Pavement Surface Type | Not set |
---|---|---|---|
Type of Traffic Control Provided | Not set | DIST-CO-RTE | Not set |
Direction of Travel | Not set | Post Mile | Not set |
Lanes to be Tested | Not set | Station | Not set |
Test Details
DIME Sample ID: 2023-02-02-43
DIME Test ID: 2023-02-02-43-2
Testing Lab: CT HQ - FFS - Skid Testing
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2023-03-06
Test Results
Pavement or Bridge Deck?: Bridge Deck
Input Type: Measured
Tester's full name: Harish Thakur
Date of test: 02/02/2023
Air Temperature: 59 F
Tire Pressure: 24 psi
Equipment PST #: 1000-7/1000-8
Is Calibration within ± values: Yes
Weather: SUNNY
Direction/Lane #: SB: Southbound Direction of Travel
Edge used to measure reference distance: BEGIN BRIDGE
Edge used to measure position: LEFT OF GUTTER
Reference Distance 1: 37 ft
Reference Distance 2: 40 ft
Reference Distance 3: 43 ft
Direction and Lane # for Stationing 1: SB
Direction and Lane # for Stationing 2: SB
Direction and Lane # for Stationing 3: SB
Position for Stationing 1: 12 ft
Position for Stationing 2: 12 ft
Position for Stationing 3: 12 ft
Percent Grade for 1st Stationing: 0.0 %
Percent Grade for 2nd Stationing: 0.0 %
Percent Grade for 3rd Stationing: 0.0 %
Corrected Coefficients of Friction for Stationing 1: 0.44
Corrected Coefficients of Friction for Stationing 2: 0.43
Corrected Coefficients of Friction for Stationing 3: 0.38
Average Coefficient of Friction: 0.42
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 3/6/2023 ✔