Sample Record
Owner Lab
- CT HQ - FFS - Skid Testing
DIME Sample ID 2023-02-02-43
Project Information
Project Identifiers | Project ID: 211183 DEA: 062HT014 EFIS: 0613000318 COOP: HSR1446 |
---|---|
DIST-CO-RTE-PM | 06-FRE-145,99(var),180,41-various |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Construct crossings in Madera and Fresno for High Speed Rail project: SR 145, SR 99, SR 180, SR 41. |
Location Description | Madera and Fresno Counties; HST crossings at SR 145, SR 99, SR 180, SR 41. |
QA Service Level | 2 (Verified on 02/04/2016) |
Sample Information
Sample Taken Date | 02/02/2023 | Sample Unique Key | 43 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 02/02/2023 |
Sample type | Acceptance | A brief description of the sample | BRIDGE DECK |
The quantity of what the sample constitutes | 66FT LONG | From where was the sample collected | Job Site |
First name of sampler or witnessed by | HARISH | Last name of sampler or witnessed by | Thakur |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | CT | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Roadway/Bridge Surface | Pavement Surface Type | Not set |
---|---|---|---|
Type of Traffic Control Provided | Not set | DIST-CO-RTE | Not set |
Direction of Travel | Not set | Post Mile | Not set |
Lanes to be Tested | Not set | Station | Not set |
Submitted Tests
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2023-02-02-43-1 CTM 342-August 2012 (Verified)
DIME Test ID: 2023-02-02-43-2 CTM 342-August 2012 (Verified)