Summary for Test 2023-01-11-42-3
Test performed: CTM 521-June 2020Project Information
Project Identifiers | Project ID: 214993 DEA: 051F5004 EFIS: 0514000003 |
---|---|
DIST-CO-RTE-PM | 05-SB-101,135-70.6/71.2;0.1 |
Award Date | 11/17/2020 |
Closeout Date | 01/11/2024 |
Work Description | CONSTRUCT CONCRETE BRIDGE, BRIDGE REMOVAL, COLD PLANE, PLACE HMA. |
Location Description | SANTA BARBARA COUNTY AT LOS ALAMOS ON ROUTE 101 FROM 0.3 MILE SOUTH TO 0.3 MILE NORTH OF ROUTE 101/135 SEPARATION AND ON ROUTE 135 AT ROUTE 101/135 SEPARATION |
QA Service Level | 1 (Verified on 09/03/2020) |
Sample Information
Sample Taken Date | 01/11/2023 | Sample Unique Key | 42 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 01/11/2023 |
Sample type | Acceptance | A brief description of the sample | 4x8 concrete cylinders |
The quantity of what the sample constitutes | CY | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Isaac | Last name of sampler or witnessed by | Gleffe |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Calportland/Donovan | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | 675RN1060 |
---|---|---|---|
The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 1825922 | |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | revolving drum truck from chute | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2023-01-11-42
DIME Test ID: 2023-01-11-42-3
Testing Lab: CT D05 - Santa Maria Field Laboratory
Test Method: CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete Cylinders
Test Release Date: 2023-02-23
Test Results
Unit system used?: US Units
Number of specimens: 3
Test performed: With no density determined
Input Type: Calculated
Tester's full name: Isaac Gleffe
Date of test: 02/22/2023
Capped in accordance with?: ASTM C617 - Sulfur Mortar Cap
Average diameter of cylinder 1: 3.99 in
Average diameter of cylinder 2: 3.99 in
Average diameter of cylinder 3: 4.00 in
Maximum load on cylinder 1: 60758 lb
Maximum load on cylinder 2: 61467 lb
Maximum load on cylinder 3: 62210 lb
Type of fracture pattern of cylinder 1: 4
Type of fracture pattern of cylinder 2: 4
Type of fracture pattern of cylinder 3: 4
Comment on any defect in either specimen or caps (Max 250 Characters): no data
Correction factor for cylinder 1: 1
Correction factor for cylinder 2: 1
Correction factor for cylinder 3: 1
Age of specimen: 42 days
Age of specimen in hours: 1008 hours
Cross sectional area of cylinder 1: 12.53 in^2
Cross sectional area of cylinder 2: 12.55 in^2
Cross sectional area of cylinder 3: 12.57 in^2
Compressive strength (to nearest 10 psi): 4900 psi
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 2/23/2023 ✔