Project Details
This page displays current information for project DEA: 051F5004.
Project Information
Project Identifiers | Project ID: 214993 DEA: 051F5004 EFIS: 0514000003 |
---|---|
DIST-CO-RTE-PM | 05-SB-101,135-70.6/71.2;0.1 |
Award Date | 11/17/2020 |
Closeout Date | 01/11/2024 |
Work Description | CONSTRUCT CONCRETE BRIDGE, BRIDGE REMOVAL, COLD PLANE, PLACE HMA. |
Location Description | SANTA BARBARA COUNTY AT LOS ALAMOS ON ROUTE 101 FROM 0.3 MILE SOUTH TO 0.3 MILE NORTH OF ROUTE 101/135 SEPARATION AND ON ROUTE 135 AT ROUTE 101/135 SEPARATION |
QA Service Level | 1 (Verified on 09/03/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
jason.torres@dot.ca.gov | Jason Torres | Resident Engineer | Caltrans RE DB |
alex.martinez@dot.ca.gov | Alex Martinez | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 85 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-03-27-3 | 03/27/2023 | 03/27/2023 | Department Acceptance | Roadway/Bridge Surface | View |
2023-01-30-26 | 01/30/2023 | 01/30/2023 | Department Acceptance | Hot Mix Asphalt | View |
2023-01-20-42 | 01/20/2023 | 01/04/2023 | Quality Control | Roadway/Bridge Surface | View |
2023-01-20-38 | 01/20/2023 | 01/21/2023 | Department Acceptance | Concrete | View |
2023-01-12-48 | 01/12/2023 | 01/20/2023 | Department Acceptance | Concrete | View |
2023-01-11-42 | 01/11/2023 | 01/11/2023 | Department Acceptance | Concrete | View |
2023-01-19-31 | 01/19/2023 | 01/19/2023 | Department Acceptance | Aggregate | View |
2023-01-20-21 | 01/20/2023 | 01/20/2023 | Department Acceptance | Aggregate | View |
2023-01-11-34 | 01/11/2023 | 01/11/2023 | Department Acceptance | Aggregate | View |
2022-12-15-7 | 12/15/2022 | 12/15/2022 | Department Acceptance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods