Summary for Test 2023-01-20-42-1
Test performed: CTM 342-August 2012Project Information
Project Identifiers | Project ID: 214993 DEA: 051F5004 EFIS: 0514000003 |
---|---|
DIST-CO-RTE-PM | 05-SB-101,135-70.6/71.2;0.1 |
Award Date | 11/17/2020 |
Closeout Date | 01/11/2024 |
Work Description | CONSTRUCT CONCRETE BRIDGE, BRIDGE REMOVAL, COLD PLANE, PLACE HMA. |
Location Description | SANTA BARBARA COUNTY AT LOS ALAMOS ON ROUTE 101 FROM 0.3 MILE SOUTH TO 0.3 MILE NORTH OF ROUTE 101/135 SEPARATION AND ON ROUTE 135 AT ROUTE 101/135 SEPARATION |
QA Service Level | 1 (Verified on 09/03/2020) |
Sample Information
Sample Taken Date | 01/20/2023 | Sample Unique Key | 42 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 01/04/2023 |
Sample type | Quality Control | A brief description of the sample | Bridge deck surface |
The quantity of what the sample constitutes | 60' long | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Jessie | Last name of sampler or witnessed by | Wilson |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | NA | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Roadway/Bridge Surface | Pavement Surface Type | Not set |
---|---|---|---|
Type of Traffic Control Provided | Not set | DIST-CO-RTE | Not set |
Direction of Travel | Not set | Post Mile | Not set |
Lanes to be Tested | Not set | Station | Not set |
Test Details
DIME Sample ID: 2023-01-20-42
DIME Test ID: 2023-01-20-42-1
Testing Lab: CT HQ - FFS - Skid Testing
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2023-02-27
Test Results
Pavement or Bridge Deck?: Bridge Deck
Input Type: Measured
Tester's full name: Jessie Wilson
Date of test: 01/20/2023
Air Temperature: 45 F
Tire Pressure: 26 psi
Equipment PST #: 1000-9
Is Calibration within ± values: Yes
Weather: Sunny
Direction/Lane #: NB: Northbound Direction of Travel
Edge used to measure reference distance: no data
Edge used to measure position: In the direction of travel, measurements are
Reference Distance 1: 14 ft
Reference Distance 2: 17 ft
Reference Distance 3: 20 ft
Direction and Lane # for Stationing 1: NA
Direction and Lane # for Stationing 2: NA
Direction and Lane # for Stationing 3: NA
Position for Stationing 1: 6 ft
Position for Stationing 2: 6 ft
Position for Stationing 3: 6 ft
Percent Grade for 1st Stationing: 0.0 %
Percent Grade for 2nd Stationing: 0.0 %
Percent Grade for 3rd Stationing: 0.0 %
Corrected Coefficients of Friction for Stationing 1: 0.36
Corrected Coefficients of Friction for Stationing 2: 0.30
Corrected Coefficients of Friction for Stationing 3: 0.35
Average Coefficient of Friction: 0.34
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 2/27/2023 ✔