Summary for Test 2023-01-07-1-10

Test performed: CTM 202-November 2011

Project Information

Project IdentifiersProject ID: 212112
DEA: 080C2514
EFIS: 0816000076
COOP: 081645
DIST-CO-RTE-PM08-SBD-10-0.0/13.2
Award Date06/06/2018
Closeout DateNot set
Work DescriptionDesign-Build of I-10 Corridor Contract 1 - Adding 2 new Express Lanes
Location DescriptionLA/SBD County Line to PM 13.2 near I-15
QA Service Level1 (Verified on 10/16/2019)

Sample Information

Sample Taken Date01/07/2023 Sample Unique Key1
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing01/10/2023
Sample typeVerification A brief description of the samplePSUE 3/4" HMA-A-SP R15 0.75% LAS
The quantity of what the sample constitutes3 Bags Of Coldfeed Agg., 2 Bags Of Rap From where was the sample collectedManufacturer
First name of sampler or witnessed byVulcan Last name of sampler or witnessed byQC
Title of sampler Telephone number of sampler
Laboratory sample identification0106A-23 Linked DIME Sample ID
The fabricator/manufacturer/facility nameBelt Cut at Vulcan Irwindale Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-19-0035
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number220831A IRW SJR LS A detailed description of where the material sample was collectedBelt Cut at Vulcan Irwindale Plant
Where the material sample would have been placed if not sampledAsphalt Paving Primary Aggregate Nominal Size3/4 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2023-01-07-1
DIME Test ID: 2023-01-07-1-10
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2023-04-05

Test Results


What size aggregate is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: Yes
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: Satish Jain/A.B/ Larry Diaz
Date of test: 01/17/2023
Cumulative percent passing the 3 in. sieve: 100 %
Cumulative percent passing the 2 1/2 in. sieve: 100 %
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 95 %
Cumulative percent passing the 1/2 in. sieve: 80 %
Cumulative percent passing the 3/8 in. sieve: 72 %
Cumulative percent passing the #4 sieve: 49 %
Cumulative percent passing the #8 sieve: 35 %
Cumulative percent passing the #16 sieve: 25 %
Cumulative percent passing the #30 sieve: 16 %
Cumulative percent passing the #50 sieve: 10 %
Cumulative percent passing the #100 sieve: 6 %
Cumulative percent passing the #200 sieve: 4 %
General comments (publicly viewable) (Max 1000 characters): Comb. Agg. Gradation W/Rap Gradation Correlation Factors

Test was verified on 4/5/2023