Summary for Test 2022-12-05-56-2

Test performed: AASHTO T240-17

Project Information

Project IdentifiersProject ID: 213707
DEA: 081C38U4
EFIS: 0817000196
DIST-CO-RTE-PM08-RIV-10-6.7/R25.1
Award Date11/26/2019
Closeout Date11/01/2023
Work DescriptionRemove concrete pavement and base, and place HMA and JPCP
Location DescriptionROUTE 10/60 SEPARATION IN BEAUMONT TO ROUTE 10/111 SEPARATION NEAR CABAZON.
QA Service Level1 (Verified on 01/09/2020)

Sample Information

Sample Taken Date12/05/2022 Sample Unique Key56
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing12/08/2022
Sample typeDepartment Acceptance A brief description of the samplePG Asphalt Binder
The quantity of what the sample constitutes1 Quart Can From where was the sample collectedSupplier
First name of sampler or witnessed byMartin Marietta QC Last name of sampler or witnessed byMartin Marietta QC
Title of sampler Telephone number of sampler
Laboratory sample identification0769-22 Linked DIME Sample ID
The fabricator/manufacturer/facility nameCCA-Lake Elsinore Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAsphalt Binder Performance GradePG 64-28 M
ModifiedYes Lot number
Sublot number Tank number
Time of sample HMA Supplier
Certified Asphalt SupplierValero Marketing & Supply - Wilmington CA MultigradeNo
Multigrade Type Asphalt Binder Mix Number

Test Details

DIME Sample ID: 2022-12-05-56
DIME Test ID: 2022-12-05-56-2
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2023-01-23

Test Results


Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Sm Ali
Date of test: 01/09/2023
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 167.269 grams
Mass of empty container #2: 169.565 grams
Mass of container #1 before test (m1i): 202.094 grams
Mass of container #2 before test (m2i): 204.613 grams
Mass of container #1 after test (m1f): 201.928 grams
Mass of container #2 after test (m2f): 204.441 grams
Average mass change: -0.484 percent
General comments (publicly viewable) (Max 1000 characters): - 0.484 + 0.006 = - 0.478

Test was verified on 1/23/2023