Summary for Test 2022-11-23-5-3
Test performed: CTM 521-June 2020Project Information
Project Identifiers | Project ID: 214993 DEA: 051F5004 EFIS: 0514000003 |
---|---|
DIST-CO-RTE-PM | 05-SB-101,135-70.6/71.2;0.1 |
Award Date | 11/17/2020 |
Closeout Date | 01/11/2024 |
Work Description | CONSTRUCT CONCRETE BRIDGE, BRIDGE REMOVAL, COLD PLANE, PLACE HMA. |
Location Description | SANTA BARBARA COUNTY AT LOS ALAMOS ON ROUTE 101 FROM 0.3 MILE SOUTH TO 0.3 MILE NORTH OF ROUTE 101/135 SEPARATION AND ON ROUTE 135 AT ROUTE 101/135 SEPARATION |
QA Service Level | 1 (Verified on 09/03/2020) |
Sample Information
Sample Taken Date | 11/23/2022 | Sample Unique Key | 5 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 11/24/2022 |
Sample type | Quality Assurance | A brief description of the sample | PCC |
The quantity of what the sample constitutes | 7 cy | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Salvador | Last name of sampler or witnessed by | Lopez-Zamora |
Title of sampler | ARET | Telephone number of sampler | 8057483854 |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Calportland/Donaven | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name | Los Alamos Bridge |
Material Information
Material Type | Concrete | The concrete mix design number | 590GN1060 |
---|---|---|---|
The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | NA | |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | Discharge from concrete truck into wheelbarrow | Where the material sample would have been placed if not sampled | abut 1 back wall |
From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2022-11-23-5
DIME Test ID: 2022-11-23-5-3
Testing Lab: CT D05 - Santa Maria Field Laboratory
Test Method: CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete Cylinders
Test Release Date: 2023-01-10
Test Results
Unit system used?: US Units
Number of specimens: 3
Test performed: With no density determined
Input Type: Calculated
Tester's full name: Isaac Gleffe
Date of test: 01/04/2023
Capped in accordance with?: ASTM C617 - Sulfur Mortar Cap
Average diameter of cylinder 1: 3.97 in
Average diameter of cylinder 2: 3.98 in
Average diameter of cylinder 3: 3.98 in
Maximum load on cylinder 1: 64689 lb
Maximum load on cylinder 2: 64779 lb
Maximum load on cylinder 3: 61188 lb
Type of fracture pattern of cylinder 1: 2
Type of fracture pattern of cylinder 2: 2
Type of fracture pattern of cylinder 3: 3
Comment on any defect in either specimen or caps (Max 250 Characters): no data
Correction factor for cylinder 1: 1
Correction factor for cylinder 2: 1
Correction factor for cylinder 3: 1
Age of specimen: 42 days
Age of specimen in hours: 1008 hours
Cross sectional area of cylinder 1: 12.38 in^2
Cross sectional area of cylinder 2: 12.42 in^2
Cross sectional area of cylinder 3: 12.42 in^2
Compressive strength (to nearest 10 psi): 5130 psi
General comments (publicly viewable) (Max 1000 characters): abut 1 back wall 42 day BK
Test was verified on 1/10/2023 ✔