Summary for Test 2022-12-14-6-1

Test performed: CTM 231-March 2013

Project Information

Project IdentifiersProject ID: 214993
DEA: 051F5004
EFIS: 0514000003
DIST-CO-RTE-PM05-SB-101,135-70.6/71.2;0.1
Award Date11/17/2020
Closeout Date01/11/2024
Work DescriptionCONSTRUCT CONCRETE BRIDGE, BRIDGE REMOVAL, COLD PLANE, PLACE HMA.
Location DescriptionSANTA BARBARA COUNTY AT LOS ALAMOS ON ROUTE 101 FROM 0.3 MILE SOUTH TO 0.3 MILE NORTH OF ROUTE 101/135 SEPARATION AND ON ROUTE 135 AT ROUTE 101/135 SEPARATION
QA Service Level1 (Verified on 09/03/2020)

Sample Information

Sample Taken Date12/14/2022 Sample Unique Key6
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing12/14/2022
Sample typeAcceptance A brief description of the sampleClass 2 Aggregate Base
The quantity of what the sample constitutes1000 sq yd From where was the sample collectedJob Site
First name of sampler or witnessed bySalvador Last name of sampler or witnessed byLopez-Zamora
Title of samplerARET Telephone number of sampler8057483854
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameCalportland-Garey Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-42-0014
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedabutment 1
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size3/4 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2022-12-14-6
DIME Test ID: 2022-12-14-6-1
Testing Lab: CT D05 - Santa Maria Field Laboratory
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2022-12-14

Test Results


Method Type:: Standard Count
Number of Tests:: 3
Common Test Maximum Used:: Yes
Input Type: Calculated
Tester's full name: Salvador Lopez-Zamora
Date of test: 12/14/2022
Sum of Count or Density: 2.27 g/cc
Average of Count or Density: 2.29 g/cc
Sum of Moisture Count: 0.13 g/cc
Average of Moisture Count: 0.18 g/cc
Count Ratio Density: 0.48
Count Ratio Moisture: 0.18
Calculated Percent Relative Compaction: 101.3 %
Reported Percent Relative Compaction: 101 %
General comments (publicly viewable) (Max 1000 characters): 221214B

Test File Attachments

File NameExtensionFile SizeDate UploadedTest IDActions
05-1F5004_37041_221214B_Soils compaction_abut1 app slab1_Class 2 ABpdf188.93 KB12/14/20222022-12-14-6-1   Info

Test was verified on 12/14/2022